The invention discloses a building tubular pile construction process. According to the technical scheme, the building tubular pile construction process specifically comprises the following steps thatS1, the ground is leveled, specifically, surface soil is removed, leveling and rolling compaction are conducted, it is guaranteed that a pile driver walks on a construction site without sinking, and machines do not settle during construction; S2, a pile pressing machine is placed in place to a pile pressing point, the pile pressing machine is debugged, the center of a clamping jaw of the pile pressing machine is basically aligned with a positioning sample pile on the ground to guarantee vertical stability, the pile pressing machine is leveled, and inclination and movement do not occur in construction; and S3, a prefabricate tubular pile is hoisted, a hanging pile is tied through a steel wire rope and a rigging, and then the rigging is installed on a hanging ring of the pile pressing machine, so that the flatness of the construction ground is guaranteed, the situation that the machine does not sink during walking and does not sink mechanically during construction, the center of the clamping jaw of the pile pressing machine can be aligned with the positioning sample pile on the ground basically, vertical stability is guaranteed, and the accuracy is improved..
本发明公开了一种建筑管桩施工工艺,其技术方案要点是:所述建筑管桩施工工艺具体包括以下步骤:步骤一、整平地面:首先清除表土,整平碾压,确保打桩机在施工场地上行走不陷机,施工时机械不沉降;步骤二、桩机就位:压桩机就位至压桩点,调试好压桩机,使压桩机的夹持钳口中心与地面上的定位样桩基本对准保证垂直稳定,将桩机调平,在施工中不发生倾斜、移动;步骤三、起吊预制管桩:先用钢丝绳和索具拴好吊桩,然后索具安装在压桩机的吊环上,有利于确保施工地面的平整性,防止行走不陷机,施工时机械不沉降,有利于压桩机的夹持钳口中心与地面上的定位样桩基本对准保证垂直稳定,提高精准度。
The invention discloses a building tubular pile construction process. According to the technical scheme, the building tubular pile construction process specifically comprises the following steps thatS1, the ground is leveled, specifically, surface soil is removed, leveling and rolling compaction are conducted, it is guaranteed that a pile driver walks on a construction site without sinking, and machines do not settle during construction; S2, a pile pressing machine is placed in place to a pile pressing point, the pile pressing machine is debugged, the center of a clamping jaw of the pile pressing machine is basically aligned with a positioning sample pile on the ground to guarantee vertical stability, the pile pressing machine is leveled, and inclination and movement do not occur in construction; and S3, a prefabricate tubular pile is hoisted, a hanging pile is tied through a steel wire rope and a rigging, and then the rigging is installed on a hanging ring of the pile pressing machine, so that the flatness of the construction ground is guaranteed, the situation that the machine does not sink during walking and does not sink mechanically during construction, the center of the clamping jaw of the pile pressing machine can be aligned with the positioning sample pile on the ground basically, vertical stability is guaranteed, and the accuracy is improved..
本发明公开了一种建筑管桩施工工艺,其技术方案要点是:所述建筑管桩施工工艺具体包括以下步骤:步骤一、整平地面:首先清除表土,整平碾压,确保打桩机在施工场地上行走不陷机,施工时机械不沉降;步骤二、桩机就位:压桩机就位至压桩点,调试好压桩机,使压桩机的夹持钳口中心与地面上的定位样桩基本对准保证垂直稳定,将桩机调平,在施工中不发生倾斜、移动;步骤三、起吊预制管桩:先用钢丝绳和索具拴好吊桩,然后索具安装在压桩机的吊环上,有利于确保施工地面的平整性,防止行走不陷机,施工时机械不沉降,有利于压桩机的夹持钳口中心与地面上的定位样桩基本对准保证垂直稳定,提高精准度。
Tubular pile cutting equipment for building construction
Europäisches Patentamt | 2024
|Hanging bracket for building tubular pile construction
Europäisches Patentamt | 2021
|