Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Binding installation equipment for building steel frame
The invention discloses binding installation equipment for a building steel frame. The equipment comprises a rack; two moving cavities are formed in the rack in a left-right penetrating mode; the twomoving cavities are distributed in an up-down symmetry mode with the center of the rack as the symmetry center; and fixing limiting blocks are fixedly arranged on the inner walls of the sides, close to the center of the rack, of the moving cavities. According to the binding installation equipment for the building steel frame, the steel frame used during pouring can be bound and installed, so thatworkers are prevented from directly binding the steel frame, physical power consumed by the workers in the binding process is reduced, the workers are prevented from being scratched by steel wires inthe binding process, and the situation that the workers fix a posture for a long time in the binding process and health is influenced is avoided; a position is not changed, so that the working efficiency is improved; and steel bars needing to be bound are directly ground, so that the manual grinding time is shortened.
本发明公开的一种用于建筑钢架的捆绑安装设备,包括机架,所述机架内左右贯穿设有两个移动腔,两个所述移动腔以所述机架中心为对称中心成上下对称分布,所述移动腔靠近所述机架中心的一侧内壁上固定设有固定限位块,本发明可以实现对浇筑时使用的钢架进行捆绑安装,进而避免工人直接对钢架进行捆绑,进而减少了工人在捆绑过程中所消耗的体力,并且避免了工人在捆绑过程中被钢丝划伤,并且避免了工人在捆绑过程中长时间固定姿态,从而影响自身的健康,并且不需要移动位置,从而增加了工作效率,并且直接对需要捆绑的钢筋进行打磨,减少了人工打磨的时间。
Binding installation equipment for building steel frame
The invention discloses binding installation equipment for a building steel frame. The equipment comprises a rack; two moving cavities are formed in the rack in a left-right penetrating mode; the twomoving cavities are distributed in an up-down symmetry mode with the center of the rack as the symmetry center; and fixing limiting blocks are fixedly arranged on the inner walls of the sides, close to the center of the rack, of the moving cavities. According to the binding installation equipment for the building steel frame, the steel frame used during pouring can be bound and installed, so thatworkers are prevented from directly binding the steel frame, physical power consumed by the workers in the binding process is reduced, the workers are prevented from being scratched by steel wires inthe binding process, and the situation that the workers fix a posture for a long time in the binding process and health is influenced is avoided; a position is not changed, so that the working efficiency is improved; and steel bars needing to be bound are directly ground, so that the manual grinding time is shortened.
本发明公开的一种用于建筑钢架的捆绑安装设备,包括机架,所述机架内左右贯穿设有两个移动腔,两个所述移动腔以所述机架中心为对称中心成上下对称分布,所述移动腔靠近所述机架中心的一侧内壁上固定设有固定限位块,本发明可以实现对浇筑时使用的钢架进行捆绑安装,进而避免工人直接对钢架进行捆绑,进而减少了工人在捆绑过程中所消耗的体力,并且避免了工人在捆绑过程中被钢丝划伤,并且避免了工人在捆绑过程中长时间固定姿态,从而影响自身的健康,并且不需要移动位置,从而增加了工作效率,并且直接对需要捆绑的钢筋进行打磨,减少了人工打磨的时间。
Binding installation equipment for building steel frame
一种用于建筑钢架的捆绑安装设备
LIU LAIYUAN (Autor:in)
19.03.2021
Patent
Elektronische Ressource
Chinesisch
Structural steel frame for building exterior materials installation
Europäisches Patentamt | 2019
|BEARING WALL INSTALLATION STRUCTURE IN STEEL FRAME BUILDING STRUCTURE
Europäisches Patentamt | 2015
|Steel structure bridge separated frame installation equipment and installation method thereof
Europäisches Patentamt | 2024
|Frame beam steel bar integral binding and installation construction method
Europäisches Patentamt | 2023
|Auxiliary installation equipment for building steel structure
Europäisches Patentamt | 2024
|