Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a pumped storage underground powerhouse in-plant traffic hole structure, belongs to the field of underground engineering, and provides a pumped storage underground powerhouse in-plant traffic hole structure capable of enabling an in-plant traffic hole point to be close to an underground powerhouse. The system comprises a plant-entering traffic hole, one end of the plant-entering traffic hole is a hole-entering point connected with a permanent highway, the other end of the plant-entering traffic hole is communicated with a vehicle arrival layer of an underground plant, and a spiral coiling hole section is arranged in the middle section of the plant-entering traffic hole. The spiral coiling hole section is arranged in the middle section of the incoming traffic hole, so that the incoming traffic hole can be arranged in a limited small-range area under the condition that an effective road elevation difference is achieved, and an incoming hole point of the incoming traffic hole can be not limited by the distance between the incoming traffic hole and an underground plant. Therefore, the entrance point of the entrance traffic hole is close to the underground plant,and the operation management is facilitated.
本发明公开了一种抽水蓄能地下厂房进厂交通洞结构,属于地下工程领域,提供一种可使得进厂交通洞进洞点距离地下厂房较近的抽水蓄能地下厂房进厂交通洞结构;包括进厂交通洞,进厂交通洞的一端为与永久公路连接的进洞点,进厂交通洞的另一端与地下厂房的车辆到达层连通,在进厂交通洞的中间段设置螺旋盘绕洞段。本发明通过在进厂交通洞的中间段设置有螺旋盘绕洞段,进而能够在达到有效的道路高程差的情况下,实现在有限的较小范围的区域内布置进厂交通洞,并且能实现进厂交通洞的进洞点可以不受与地下厂房距离的限制;因此可使得进厂交通洞的进洞点与地下厂房距离较近,进而方便运行管理。
The invention discloses a pumped storage underground powerhouse in-plant traffic hole structure, belongs to the field of underground engineering, and provides a pumped storage underground powerhouse in-plant traffic hole structure capable of enabling an in-plant traffic hole point to be close to an underground powerhouse. The system comprises a plant-entering traffic hole, one end of the plant-entering traffic hole is a hole-entering point connected with a permanent highway, the other end of the plant-entering traffic hole is communicated with a vehicle arrival layer of an underground plant, and a spiral coiling hole section is arranged in the middle section of the plant-entering traffic hole. The spiral coiling hole section is arranged in the middle section of the incoming traffic hole, so that the incoming traffic hole can be arranged in a limited small-range area under the condition that an effective road elevation difference is achieved, and an incoming hole point of the incoming traffic hole can be not limited by the distance between the incoming traffic hole and an underground plant. Therefore, the entrance point of the entrance traffic hole is close to the underground plant,and the operation management is facilitated.
本发明公开了一种抽水蓄能地下厂房进厂交通洞结构,属于地下工程领域,提供一种可使得进厂交通洞进洞点距离地下厂房较近的抽水蓄能地下厂房进厂交通洞结构;包括进厂交通洞,进厂交通洞的一端为与永久公路连接的进洞点,进厂交通洞的另一端与地下厂房的车辆到达层连通,在进厂交通洞的中间段设置螺旋盘绕洞段。本发明通过在进厂交通洞的中间段设置有螺旋盘绕洞段,进而能够在达到有效的道路高程差的情况下,实现在有限的较小范围的区域内布置进厂交通洞,并且能实现进厂交通洞的进洞点可以不受与地下厂房距离的限制;因此可使得进厂交通洞的进洞点与地下厂房距离较近,进而方便运行管理。
Pumped storage underground powerhouse entrance adit structure
抽水蓄能地下厂房进厂交通洞结构
LI ZHIGUO (Autor:in)
23.03.2021
Patent
Elektronische Ressource
Chinesisch
Stability Study of a Pumped Storage Power Station's Underground Powerhouse
Trans Tech Publications | 2013
|Stability Study of a Pumped Storage Power Station's Underground Powerhouse
British Library Conference Proceedings | 2013
|Underground Technology Program: Test Adit Construction
NTIS | 1996
|Dynamical Analysis on Underground Powerhouse of Yixing Pumped-Storage Power Station
British Library Conference Proceedings | 2014
|