Concrete precast block rapid throw-filling structure and throw-filling method
The invention discloses a concrete precast block rapid throw-filling structure and a throw-filling method. An existing throw-filling barge is low in carrying capacity utilization rate, long in time, low in efficiency, large in personnel demand and high in labor cost, and needs to be repeatedly loaded and transported back and forth; and meanwhile, one more forklift is needed, so that the comprehensive cost is high. The throw-filling structure comprises a positioning ship (1) and a throw-filling barge (5); a generator (3) and two winches (2) are installed in front of cabins of the positioning ship and the throw-filling barge respectively; four supports (7) are manufactured on the ship edges of the two longitudinal sides of ship bodies of the positioning ship and the throw-filling barge respectively; a guide pulley (9) is installed on each support; and steel wire ropes of the winches at the corresponding sides penetrate through the pulleys and are finally fixed to supporting columns on astern. The concrete precast block rapid throw-filling structure and the throw-filling method are used for rapid throw-filling of a concrete precast block.
混凝土预制块快速抛填结构及抛填方法。以往抛填驳船运载量利用率低,需要多次往返装运,时间长、效率低、人员需量多,人力成本很高;同时需要多配一台铲车,综合成本高。本发明组成包括:定位船(1)和抛填驳船(5),所述的定位船和所述的抛填驳船的船舱前都安装一台发电机(3)和两台卷扬机(2),所述的定位船和所述的抛填驳船的船体纵向两侧船边各做四个支座(7),每个所述的支座上各安装一个导向滑轮(9),对应侧卷扬机的钢丝绳穿过滑轮,最后固定在船尾的支柱上。本发明用于混凝土预制块快速抛填。
Concrete precast block rapid throw-filling structure and throw-filling method
The invention discloses a concrete precast block rapid throw-filling structure and a throw-filling method. An existing throw-filling barge is low in carrying capacity utilization rate, long in time, low in efficiency, large in personnel demand and high in labor cost, and needs to be repeatedly loaded and transported back and forth; and meanwhile, one more forklift is needed, so that the comprehensive cost is high. The throw-filling structure comprises a positioning ship (1) and a throw-filling barge (5); a generator (3) and two winches (2) are installed in front of cabins of the positioning ship and the throw-filling barge respectively; four supports (7) are manufactured on the ship edges of the two longitudinal sides of ship bodies of the positioning ship and the throw-filling barge respectively; a guide pulley (9) is installed on each support; and steel wire ropes of the winches at the corresponding sides penetrate through the pulleys and are finally fixed to supporting columns on astern. The concrete precast block rapid throw-filling structure and the throw-filling method are used for rapid throw-filling of a concrete precast block.
混凝土预制块快速抛填结构及抛填方法。以往抛填驳船运载量利用率低,需要多次往返装运,时间长、效率低、人员需量多,人力成本很高;同时需要多配一台铲车,综合成本高。本发明组成包括:定位船(1)和抛填驳船(5),所述的定位船和所述的抛填驳船的船舱前都安装一台发电机(3)和两台卷扬机(2),所述的定位船和所述的抛填驳船的船体纵向两侧船边各做四个支座(7),每个所述的支座上各安装一个导向滑轮(9),对应侧卷扬机的钢丝绳穿过滑轮,最后固定在船尾的支柱上。本发明用于混凝土预制块快速抛填。
Concrete precast block rapid throw-filling structure and throw-filling method
混凝土预制块快速抛填结构及抛填方法
WANG YUJIE (Autor:in) / CHEN WEI (Autor:in) / HOU ZHAOTAO (Autor:in) / SUN LONGLONG (Autor:in) / GAO YANG (Autor:in) / WU JUNGANG (Autor:in) / LIU ZHEN (Autor:in) / WANG QINGGUO (Autor:in) / DU YONGXING (Autor:in) / BIAN HAIMING (Autor:in)
26.03.2021
Patent
Elektronische Ressource
Chinesisch
On-water sand-gravel material throw-filling dividing device
Europäisches Patentamt | 2015
|