Breast beam replacing structure between support pile and basement exterior wall and construction method of breast beam replacing structure between support pile and basement exterior wall
The invention provides a breast beam replacing structure between a supporting piles and a basement exterior wall and a construction method of the breast beam replacing structure of the breast beam replacing structure between the support pile and the basement exterior wall. The breast beam replacing structure comprises wale formworks connecting the supporting piles, basement exterior wall formworksparallel to the basement wale formworks, breast beam replacing beam formworks arranged between the wale formworks and the basement exterior wall formworks at preset intervals and an exterior wall operation frame, wherein one end of each breast beam replacing beam formwork perpendicularly communicates the wale formwork, the other end of each breast beam replacing beam formwork is perpendicularly connected to the basement exterior wall formwork, the exterior wall operation frame comprises a plurality of vertical rods and transverse rods perpendicularly connected to the vertical rods, and the top of each vertical rod is supported at the bottom of the wale formwork and the bottom of the breast beam replacing beam formwork. According to the breast beam replacing structure between the support pile and the basement exterior wall and the construction method of the breast beam replacing structure between the support pile and the basement exterior wall, the formworks and a reinforcing system are easy and convenient to operate, and the construction period can be shortened under the condition that the number of foundation pit supporting piles is large, the breast beam replacing formworks areeasy to detach and can be quickly circulated, and compared with common breast beam replacing formworks construction, the construction cost is low.
本发明提供了一种支护桩与地下室外墙之间换撑梁结构及其施工方法,本发明通过连接各根支护桩的腰梁模板;与所述地下室腰梁模板平行设置的地下室外墙模板;在所述腰梁模板和地下室外墙模板之间并按预设间隔设置的换撑梁模板,每个换撑梁模板的一端与所述腰梁模板垂直连通,每个换撑梁模板的另一端与所述地下室外墙模板垂直连接;外墙操作架,所述外墙操作架包括多根立杆和与所述立杆垂直连接的横杆,每根立杆的顶部支撑于腰梁模板和换撑梁模板的底部。本发明的该模板及加固体系操作简便,对于基坑支护桩数量大的情况下,能缩短施工工期。换撑梁模板易于拆除,能快速周转;相对于普通换撑梁模板施工,造价低廉。
Breast beam replacing structure between support pile and basement exterior wall and construction method of breast beam replacing structure between support pile and basement exterior wall
The invention provides a breast beam replacing structure between a supporting piles and a basement exterior wall and a construction method of the breast beam replacing structure of the breast beam replacing structure between the support pile and the basement exterior wall. The breast beam replacing structure comprises wale formworks connecting the supporting piles, basement exterior wall formworksparallel to the basement wale formworks, breast beam replacing beam formworks arranged between the wale formworks and the basement exterior wall formworks at preset intervals and an exterior wall operation frame, wherein one end of each breast beam replacing beam formwork perpendicularly communicates the wale formwork, the other end of each breast beam replacing beam formwork is perpendicularly connected to the basement exterior wall formwork, the exterior wall operation frame comprises a plurality of vertical rods and transverse rods perpendicularly connected to the vertical rods, and the top of each vertical rod is supported at the bottom of the wale formwork and the bottom of the breast beam replacing beam formwork. According to the breast beam replacing structure between the support pile and the basement exterior wall and the construction method of the breast beam replacing structure between the support pile and the basement exterior wall, the formworks and a reinforcing system are easy and convenient to operate, and the construction period can be shortened under the condition that the number of foundation pit supporting piles is large, the breast beam replacing formworks areeasy to detach and can be quickly circulated, and compared with common breast beam replacing formworks construction, the construction cost is low.
本发明提供了一种支护桩与地下室外墙之间换撑梁结构及其施工方法,本发明通过连接各根支护桩的腰梁模板;与所述地下室腰梁模板平行设置的地下室外墙模板;在所述腰梁模板和地下室外墙模板之间并按预设间隔设置的换撑梁模板,每个换撑梁模板的一端与所述腰梁模板垂直连通,每个换撑梁模板的另一端与所述地下室外墙模板垂直连接;外墙操作架,所述外墙操作架包括多根立杆和与所述立杆垂直连接的横杆,每根立杆的顶部支撑于腰梁模板和换撑梁模板的底部。本发明的该模板及加固体系操作简便,对于基坑支护桩数量大的情况下,能缩短施工工期。换撑梁模板易于拆除,能快速周转;相对于普通换撑梁模板施工,造价低廉。
Breast beam replacing structure between support pile and basement exterior wall and construction method of breast beam replacing structure between support pile and basement exterior wall
支护桩与地下室外墙之间换撑梁结构及其施工方法
WANG RUHAO (Autor:in) / GAO SHANG (Autor:in) / BA RUI (Autor:in) / CHEN CHONG (Autor:in) / YANG ZIHAN (Autor:in)
02.04.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of retaining structure of support pile-basement exterior wall co-structure