Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge arch rib hoisting and supporting bracket integrated construction device
The invention discloses a bridge arch rib hoisting and supporting bracket integrated construction device which comprises a base, a lifting frame is fixedly connected to the top end of the base, a first pneumatic push rod is fixedly connected to the inner wall of the lifting frame, a moving block is welded to the output end of the first pneumatic push rod, and a moving rod penetrates through the interior of the moving block; and first limiting grooves are formed in two ends of the moving rod and located in the inner wall of the lifting frame. According to the bridge arch rib hoisting and supporting bracket integrated construction device, by arranging a lifting column, in the lifting frame, the first pneumatic push rod works to drive the moving block to move, and the moving block drives the first lifting rod to move along the first limiting groove through the moving rod; the rotating angle of the first lifting rod is 60 degrees, the first lifting rod drives the second lifting column to move along a second limiting groove through the lifting column, the rotating angle of the second lifting rod is 60 degrees, and lifting operation of the lifting frame is achieved through relative movement of the first lifting rod and the second lifting rod.
本发明公开了一种桥梁拱肋吊运及支撑支架一体化施工装置,包括底座,所述底座的顶端固定连接有升降框架,且升降框架的内壁固定连接有第一气动推杆,所述第一气动推杆的输出端焊接有移动块,且移动块的内部贯穿有移动杆,所述移动杆的两端位于升降框架内壁设置有第一限位槽,该一种桥梁拱肋吊运及支撑支架一体化施工装置,通过设置升降柱,在升降框架中,第一气动推杆工作带动移动块运动,移动块通过移动杆带动第一升降杆沿第一限位槽运动,第一升降杆旋转角度为60°,第一升降杆通过升降柱带动第二升降柱沿第二限位槽运动,第二升降杆的旋转角度为60°,通过第一升降杆与第二升降杆的相对运动,实现升降框架的升降操作。
Bridge arch rib hoisting and supporting bracket integrated construction device
The invention discloses a bridge arch rib hoisting and supporting bracket integrated construction device which comprises a base, a lifting frame is fixedly connected to the top end of the base, a first pneumatic push rod is fixedly connected to the inner wall of the lifting frame, a moving block is welded to the output end of the first pneumatic push rod, and a moving rod penetrates through the interior of the moving block; and first limiting grooves are formed in two ends of the moving rod and located in the inner wall of the lifting frame. According to the bridge arch rib hoisting and supporting bracket integrated construction device, by arranging a lifting column, in the lifting frame, the first pneumatic push rod works to drive the moving block to move, and the moving block drives the first lifting rod to move along the first limiting groove through the moving rod; the rotating angle of the first lifting rod is 60 degrees, the first lifting rod drives the second lifting column to move along a second limiting groove through the lifting column, the rotating angle of the second lifting rod is 60 degrees, and lifting operation of the lifting frame is achieved through relative movement of the first lifting rod and the second lifting rod.
本发明公开了一种桥梁拱肋吊运及支撑支架一体化施工装置,包括底座,所述底座的顶端固定连接有升降框架,且升降框架的内壁固定连接有第一气动推杆,所述第一气动推杆的输出端焊接有移动块,且移动块的内部贯穿有移动杆,所述移动杆的两端位于升降框架内壁设置有第一限位槽,该一种桥梁拱肋吊运及支撑支架一体化施工装置,通过设置升降柱,在升降框架中,第一气动推杆工作带动移动块运动,移动块通过移动杆带动第一升降杆沿第一限位槽运动,第一升降杆旋转角度为60°,第一升降杆通过升降柱带动第二升降柱沿第二限位槽运动,第二升降杆的旋转角度为60°,通过第一升降杆与第二升降杆的相对运动,实现升降框架的升降操作。
Bridge arch rib hoisting and supporting bracket integrated construction device
一种桥梁拱肋吊运及支撑支架一体化施工装置
PAN XUEFANG (Autor:in)
06.04.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
/
B66C
Krane
,
CRANES
/
B66F
HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
,
Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last
Supporting bracket integrated equipment for bridge arch rib hoisting
Europäisches Patentamt | 2023
|Bridge arch rib hoisting and supporting bracket integrated construction method and device thereof
Europäisches Patentamt | 2022
|Integrated hoisting device and hoisting method for through arch bridge cable hoisting steel girder
Europäisches Patentamt | 2024
|Integral hoisting construction method for tied-arch bridge
Europäisches Patentamt | 2023
|