Wharf wall transverse horizontal winch slip form construction method
The invention provides a wharf wall transverse horizontal winch slip form construction method. The wharf wall transverse horizontal winch slip form construction method comprises the following steps that firstly, construction preparation is conducted; secondly, formwork installation and concrete pouring are carried out; thirdly, the formwork in the second step is driven by a winch to slide to the next construction section; fourthly, concrete pouring is conducted on the construction section; and fifthly, the third step and the fourth step are repeated till all construction and pouring of the construction section are completed. The method has the beneficial effects that compared with a traditional hoisting installation construction process, the method obviously achieves the effects of being high in construction progress, convenient and rapid to operate, mechanical-machine-team-saving, small in danger coefficient, low in construction cost and the like.
本发明提供一种码头墙身横向水平卷扬机滑模施工方法,包括如下步骤:第一步,施工准备;第二步,模板安装、砼浇筑;第三步,通过卷扬机带动所述第二步中的模板滑移至下一施工段;第四步,对施工段进行砼浇筑;第五步,重复所述第三步和所述第四步直至施工段全部施工浇筑完毕。本发明的有益效果是:较传统吊装安装施工工艺,本发明明显得到施工进度快,操作方便快捷,节省机械台班,危险系数小,工程造价低等效果。
Wharf wall transverse horizontal winch slip form construction method
The invention provides a wharf wall transverse horizontal winch slip form construction method. The wharf wall transverse horizontal winch slip form construction method comprises the following steps that firstly, construction preparation is conducted; secondly, formwork installation and concrete pouring are carried out; thirdly, the formwork in the second step is driven by a winch to slide to the next construction section; fourthly, concrete pouring is conducted on the construction section; and fifthly, the third step and the fourth step are repeated till all construction and pouring of the construction section are completed. The method has the beneficial effects that compared with a traditional hoisting installation construction process, the method obviously achieves the effects of being high in construction progress, convenient and rapid to operate, mechanical-machine-team-saving, small in danger coefficient, low in construction cost and the like.
本发明提供一种码头墙身横向水平卷扬机滑模施工方法,包括如下步骤:第一步,施工准备;第二步,模板安装、砼浇筑;第三步,通过卷扬机带动所述第二步中的模板滑移至下一施工段;第四步,对施工段进行砼浇筑;第五步,重复所述第三步和所述第四步直至施工段全部施工浇筑完毕。本发明的有益效果是:较传统吊装安装施工工艺,本发明明显得到施工进度快,操作方便快捷,节省机械台班,危险系数小,工程造价低等效果。
Wharf wall transverse horizontal winch slip form construction method
码头墙身横向水平卷扬机滑模施工方法
LI CHUANG (Autor:in) / LIU JIEZHANG (Autor:in) / ZHANG YANG (Autor:in) / ZHOU ZHUOYAN (Autor:in) / YOU ZEHUA (Autor:in)
09.04.2021
Patent
Elektronische Ressource
Chinesisch
Horizontal slip form construction device and method for curved retaining wall
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Horizontal Slip-Form Construction—Section Stability
ASCE | 2021
|WHARF WALL REINFORCEMENT STRUCTURE AND WHARF REINFORCEMENT METHOD
Europäisches Patentamt | 2015
|