Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Backfill presser foot treatment engineering design method for geological disaster treatment engineering
The invention discloses a backfill presser foot treatment engineering design method for geological disaster treatment engineering. In the step (4), main machinery of a manual backfill presser foot comprises a diesel dumper, a wood rammer (an iron rammer or a stone rammer) and a frog rammer; main machinery of a mechanical backfill presser foot comprises a dump truck, a bulldozer, a carry-scraper, a tamping roller, a flat roller and a flat plate vibrator; and the compactness and the moisture content of filled soil should be controlled in the step (6). The backfill presser foot treatment engineering design method for the geological disaster treatment engineering has the beneficial effects that the problems that in the prior art, backfill presser foot operation is complex, careless omission is likely to happen, and management is difficult are solved, and meanwhile the method is easy to implement and suitable for all areas.
本发明公开了一种地质灾害治理工程回填压脚治理工程设计方法,所述第四步(4)中人工回填压脚主要机械包括:机动翻斗车、木夯(铁夯或石夯)和蛙式打夯机;机械回填压脚主要机械包括:自卸车、推土机、铲运机、羊足碾、平蹍和平板振动器,所述第六步(6)中应控制填土的密实度和填土的含水率,本发明的有益效果是:该一种地质灾害治理工程回填压脚治理工程设计方法,解决了现有技术中回填压脚操作复杂易出现疏漏且难于管理的问题,同时本发明实施简单,适应各个区域。
Backfill presser foot treatment engineering design method for geological disaster treatment engineering
The invention discloses a backfill presser foot treatment engineering design method for geological disaster treatment engineering. In the step (4), main machinery of a manual backfill presser foot comprises a diesel dumper, a wood rammer (an iron rammer or a stone rammer) and a frog rammer; main machinery of a mechanical backfill presser foot comprises a dump truck, a bulldozer, a carry-scraper, a tamping roller, a flat roller and a flat plate vibrator; and the compactness and the moisture content of filled soil should be controlled in the step (6). The backfill presser foot treatment engineering design method for the geological disaster treatment engineering has the beneficial effects that the problems that in the prior art, backfill presser foot operation is complex, careless omission is likely to happen, and management is difficult are solved, and meanwhile the method is easy to implement and suitable for all areas.
本发明公开了一种地质灾害治理工程回填压脚治理工程设计方法,所述第四步(4)中人工回填压脚主要机械包括:机动翻斗车、木夯(铁夯或石夯)和蛙式打夯机;机械回填压脚主要机械包括:自卸车、推土机、铲运机、羊足碾、平蹍和平板振动器,所述第六步(6)中应控制填土的密实度和填土的含水率,本发明的有益效果是:该一种地质灾害治理工程回填压脚治理工程设计方法,解决了现有技术中回填压脚操作复杂易出现疏漏且难于管理的问题,同时本发明实施简单,适应各个区域。
Backfill presser foot treatment engineering design method for geological disaster treatment engineering
一种地质灾害治理工程回填压脚治理工程设计方法
XU CHENGHUA (Autor:in) / TAN JINZHONG (Autor:in) / TANG GUOYI (Autor:in) / GU WEN (Autor:in) / WANG ZHENXIANG (Autor:in)
13.04.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2021
|Geological disaster cutting and load reduction treatment engineering design method
Europäisches Patentamt | 2021
|Backfill building body on back side of geological disaster control engineering body
Europäisches Patentamt | 2023
|Phosphogypsum engineering backfill material and backfill method
Europäisches Patentamt | 2023
|Rapid lap joint track suitable for geological disaster treatment engineering rugged terrains
Europäisches Patentamt | 2021
|