Bridge thin-wall hollow pier column construction method
The invention discloses a bridge thin-wall hollow pier stud construction method, which relates to the technical field of bridge pier stud construction, and comprises the following steps: construction preparation, pier stud bottom pouring, and installation of a turning and sliding combination system, and the turning and sliding combination system comprises a template system, an operation platform, a lifting system, a construction precision control system and a water and electricity matching system. And the truss is lifted, the formwork structure is in place, the formwork structure is dismounted, in-place pouring is conducted on the formwork structure again, the next cycle is conducted upwards in sequence, and continuous pouring is conducted till pouring of the pier column is completed. The method has the advantages that the characteristics and advantages of all construction methods are integrated on the basis of an existing construction method, the construction method combining overturning and sliding is adopted and improved, an overturning and sliding combination system comprises a formwork system, an operation platform, a lifting system, a construction precision control system and a water and electricity matching system, the defects of formwork sliding and overturning construction are overcome. And the purposes of high construction speed, high safety, guaranteed concrete quality and less investment are achieved.
本发明公开了一种桥梁薄壁空心墩墩柱施工方法,它涉及桥梁墩柱施工技术领域,包括以下步骤:施工准备,墩柱底部浇筑,对翻滑结合系统进行安装,翻滑结合系统包括模板系统、操作平台、提升系统、施工精度控制系统和水电配套系统,桁架提升,模板结构就位,模板结构的拆除,模板结构再进行就位浇筑,依次向上进入下一循环,不断浇筑,直至完成墩柱的浇筑。本发明的优点在于:在现有施工方法的基础上综合各施工方法的特点、优势,采用翻滑结合并进行改进的施工方法,翻滑结合系统包括模板系统、操作平台、提升系统、施工精度控制系统和水电配套系统,克服滑模和翻模施工的缺点,达到施工速度快、安全度高、混凝土质量有保证、投入较少的目的。
Bridge thin-wall hollow pier column construction method
The invention discloses a bridge thin-wall hollow pier stud construction method, which relates to the technical field of bridge pier stud construction, and comprises the following steps: construction preparation, pier stud bottom pouring, and installation of a turning and sliding combination system, and the turning and sliding combination system comprises a template system, an operation platform, a lifting system, a construction precision control system and a water and electricity matching system. And the truss is lifted, the formwork structure is in place, the formwork structure is dismounted, in-place pouring is conducted on the formwork structure again, the next cycle is conducted upwards in sequence, and continuous pouring is conducted till pouring of the pier column is completed. The method has the advantages that the characteristics and advantages of all construction methods are integrated on the basis of an existing construction method, the construction method combining overturning and sliding is adopted and improved, an overturning and sliding combination system comprises a formwork system, an operation platform, a lifting system, a construction precision control system and a water and electricity matching system, the defects of formwork sliding and overturning construction are overcome. And the purposes of high construction speed, high safety, guaranteed concrete quality and less investment are achieved.
本发明公开了一种桥梁薄壁空心墩墩柱施工方法,它涉及桥梁墩柱施工技术领域,包括以下步骤:施工准备,墩柱底部浇筑,对翻滑结合系统进行安装,翻滑结合系统包括模板系统、操作平台、提升系统、施工精度控制系统和水电配套系统,桁架提升,模板结构就位,模板结构的拆除,模板结构再进行就位浇筑,依次向上进入下一循环,不断浇筑,直至完成墩柱的浇筑。本发明的优点在于:在现有施工方法的基础上综合各施工方法的特点、优势,采用翻滑结合并进行改进的施工方法,翻滑结合系统包括模板系统、操作平台、提升系统、施工精度控制系统和水电配套系统,克服滑模和翻模施工的缺点,达到施工速度快、安全度高、混凝土质量有保证、投入较少的目的。
Bridge thin-wall hollow pier column construction method
一种桥梁薄壁空心墩墩柱施工方法
LIU LIANGLIANG (Autor:in) / FU LUNPENG (Autor:in) / CHENG DONG (Autor:in) / MAO YAYING (Autor:in) / WANG ZHONGHUA (Autor:in) / HUANG MING (Autor:in) / CHENG PENG (Autor:in)
16.04.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Mold and method for turnover construction of thin-wall hollow pier column