Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Metallurgical mine tailing cemented filling auxiliary device and using method thereof
The invention discloses a metallurgical mine tailing cemented filling auxiliary device and a using method thereof, and relates to the technical field of tailing cemented filling. The metallurgical mine tailing cemented filling auxiliary device comprises a bag body, wherein a communicating mechanism is arranged on the surface of the bag body, an air pipe is arranged at the top of the bag body, a plug cap is arranged at the top end of the air pipe, and quicklime powder is arranged in the bag body. According to the metallurgical mine tailing cemented filling auxiliary device and the using method thereof, the metallurgical mine tailing cemented filling auxiliary device is additionally arranged, a mixture is added into a mine through a magnetic field and air pressure mode, then quick-hardening sulphoaluminate cement clinker is in contact reaction with quicklime, so that the requirement for the transportation speed is greatly reduced, meanwhile, the reaction contact surface is wide, the stability of a finished product is improved, fine materials are used on the bottom layer and the top layer, coarse materials are used on the middle layer, and as a result, the filler can better adapt to mine holes in irregular shapes, and the stability of the finished product is further improved.
本发明公开了一种冶金矿山尾矿胶结充填辅助装置及其使用方法,涉及尾矿胶结充填技术领域。该冶金矿山尾矿胶结充填辅助装置,包括囊体,所述囊体的表面设置有连通机构,所述囊体的顶部设置有气管,所述气管的顶端设置有堵塞帽,所述囊体内设置有生石灰粉。该冶金矿山尾矿胶结充填辅助装置及其使用方法,通过增设冶金矿山尾矿胶结充填辅助装置,并通过磁场和气压的方式,先将混合体加入至矿山内,再使得快硬硫铝酸盐水泥熟料与生石灰接触反应,极大的减小了对运输速度的需求,同时反应接触面较广,增加了成品的稳定性,底层和顶层使用细料,中层使用粗料,从而使得填充物可以更好的适应不规则形状的矿洞,进一步增加了成品的稳定性。
Metallurgical mine tailing cemented filling auxiliary device and using method thereof
The invention discloses a metallurgical mine tailing cemented filling auxiliary device and a using method thereof, and relates to the technical field of tailing cemented filling. The metallurgical mine tailing cemented filling auxiliary device comprises a bag body, wherein a communicating mechanism is arranged on the surface of the bag body, an air pipe is arranged at the top of the bag body, a plug cap is arranged at the top end of the air pipe, and quicklime powder is arranged in the bag body. According to the metallurgical mine tailing cemented filling auxiliary device and the using method thereof, the metallurgical mine tailing cemented filling auxiliary device is additionally arranged, a mixture is added into a mine through a magnetic field and air pressure mode, then quick-hardening sulphoaluminate cement clinker is in contact reaction with quicklime, so that the requirement for the transportation speed is greatly reduced, meanwhile, the reaction contact surface is wide, the stability of a finished product is improved, fine materials are used on the bottom layer and the top layer, coarse materials are used on the middle layer, and as a result, the filler can better adapt to mine holes in irregular shapes, and the stability of the finished product is further improved.
本发明公开了一种冶金矿山尾矿胶结充填辅助装置及其使用方法,涉及尾矿胶结充填技术领域。该冶金矿山尾矿胶结充填辅助装置,包括囊体,所述囊体的表面设置有连通机构,所述囊体的顶部设置有气管,所述气管的顶端设置有堵塞帽,所述囊体内设置有生石灰粉。该冶金矿山尾矿胶结充填辅助装置及其使用方法,通过增设冶金矿山尾矿胶结充填辅助装置,并通过磁场和气压的方式,先将混合体加入至矿山内,再使得快硬硫铝酸盐水泥熟料与生石灰接触反应,极大的减小了对运输速度的需求,同时反应接触面较广,增加了成品的稳定性,底层和顶层使用细料,中层使用粗料,从而使得填充物可以更好的适应不规则形状的矿洞,进一步增加了成品的稳定性。
Metallurgical mine tailing cemented filling auxiliary device and using method thereof
一种冶金矿山尾矿胶结充填辅助装置及其使用方法
CHEN WUJIU (Autor:in) / XU BAOHONG (Autor:in) / LIANG FENG (Autor:in) / ZHANG QIANG (Autor:in) / WANG YUFU (Autor:in) / SUN YONGMAO (Autor:in) / WU HONG (Autor:in) / SHI GANG (Autor:in) / WANG NANNAN (Autor:in) / FAN XIAOHUI (Autor:in)
16.04.2021
Patent
Elektronische Ressource
Chinesisch
Phosphorus tailing cemented filling material and preparation method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|Preparation method of novel superfine tailing cemented filling slurry
Europäisches Patentamt | 2023
|