Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a municipal manhole cover replacement integrated system. The municipal manhole cover replacement integrated system comprises a vehicle plate, four universal wheels, a cutting motor, a cutting lifting rod, a rotary cutting disc, a power connection box, an electromagnetic lifting device, a balance weight tool box, a slurry outlet pipe fixing frame, a stone slurry supplementing and filling device and a power supply branching line, the four universal wheels are equidistantly and parallelly installed at the bottom of the vehicle plate, the cutting motor is fixedly connected to the top of the front end of the vehicle plate, the cutting lifting rod is installed below the cutting motor, the rotary cutting disc is installed on the outer side of the bottom of the cutting lifting rod, and the power connection box is fixedly connected to the right side of the rear portion of the cutting motor. The municipal manhole cover replacement integrated system is simple in structure and reasonable in design, a traditional manual construction mode is replaced by machinery, all processes of manhole cover installation are integrated on one vehicle body, various construction requirements during construction are met, manpower and material resources during maintenance and installation construction are reduced, and the working efficiency of manhole cover maintenance is improved.
本发明公开了一种市政井盖更换一体化系统,包括车板、万向轮、切割电机、切割升降杆、旋转切盘、接电盒、电磁升降装置、配重工具箱、出浆管固定架、石浆补填装置、电源分接线,所述车板底部等距平行安装有四个万向轮,所述切割电机固定连接在车板前端顶部,所述切割升降杆安装在切割电机下方,所述旋转切盘安装在切割升降杆底部外侧,所述接电盒固定连接在切割电机后方右侧,本发明结构简单,设计合理,利用机械代替传统的人工施工方式,将井盖安装的各道工序集成在一辆车体上,满足了施工时的各种施工需要,减少了维护安装施工时的人力物力,挺高了井盖维护的工作效率。
The invention discloses a municipal manhole cover replacement integrated system. The municipal manhole cover replacement integrated system comprises a vehicle plate, four universal wheels, a cutting motor, a cutting lifting rod, a rotary cutting disc, a power connection box, an electromagnetic lifting device, a balance weight tool box, a slurry outlet pipe fixing frame, a stone slurry supplementing and filling device and a power supply branching line, the four universal wheels are equidistantly and parallelly installed at the bottom of the vehicle plate, the cutting motor is fixedly connected to the top of the front end of the vehicle plate, the cutting lifting rod is installed below the cutting motor, the rotary cutting disc is installed on the outer side of the bottom of the cutting lifting rod, and the power connection box is fixedly connected to the right side of the rear portion of the cutting motor. The municipal manhole cover replacement integrated system is simple in structure and reasonable in design, a traditional manual construction mode is replaced by machinery, all processes of manhole cover installation are integrated on one vehicle body, various construction requirements during construction are met, manpower and material resources during maintenance and installation construction are reduced, and the working efficiency of manhole cover maintenance is improved.
本发明公开了一种市政井盖更换一体化系统,包括车板、万向轮、切割电机、切割升降杆、旋转切盘、接电盒、电磁升降装置、配重工具箱、出浆管固定架、石浆补填装置、电源分接线,所述车板底部等距平行安装有四个万向轮,所述切割电机固定连接在车板前端顶部,所述切割升降杆安装在切割电机下方,所述旋转切盘安装在切割升降杆底部外侧,所述接电盒固定连接在切割电机后方右侧,本发明结构简单,设计合理,利用机械代替传统的人工施工方式,将井盖安装的各道工序集成在一辆车体上,满足了施工时的各种施工需要,减少了维护安装施工时的人力物力,挺高了井盖维护的工作效率。
Municipal manhole cover replacement integrated system
一种市政井盖更换一体化系统
WEI GEGE (Autor:in)
20.04.2021
Patent
Elektronische Ressource
Chinesisch
Automatic lifting integrated municipal manhole cover structure
Europäisches Patentamt | 2024
|