Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Installation method of corrugated steel plate composite wall structure system
The invention provides an installation method of a corrugated steel plate composite wall structure system. The installation method comprises the steps that 1, a corrugated steel plate composite wall is installed, specifically, S1-4, concrete pouring is conducted on a connecting area and the interior of a rectangular steel pipe through a grouting opening, and installation of the corrugated steel plate composite wall is completed; 2, a steel beam is installed, specifically, S2-1, a hinged steel beam needing to be connected to the composite wall is hoisted to a designated installation position, and S2-2, a steel beam web and a connecting plate welded to the rectangular steel pipe of the corrugated steel plate composite wall in advance are connected through high-strength bolts, so that connection between the hinged steel beam and the composite wall is completed; and 3, a floor slab is installed, specifically, S3-1, a prefabricated part of the floor slab is hoisted to the designated installation position to be installed, the position connected with the steel beam is placed on a flange of the hinged steel beam, and the position connected with the composite wall is placed on a pre-welded L-shaped connecting piece; and S3-2, after the prefabricated part of the floor slab is installed, concrete pouring is conducted on the whole floor slab, a cast-in-place part of the floor slab is formed, and installation of the complete floor slab is completed.
一种波纹钢板组合墙结构体系的安装方法,步骤:步骤1,进行波纹钢板组合墙的安装:S1‑4通过注浆口对连接区域以及矩形钢管内进行混凝土浇筑,完成此片波纹钢板组合墙的安装;步骤2,进行钢梁的安装:S2‑1吊装需连接到此片组合墙的铰接钢梁到指定的安装位;S2‑2用高强螺栓连接钢梁腹板和预先焊接在波纹钢板组合墙矩形钢管上的连接板,完成铰接钢梁与组合墙之间的连接;步骤3,进行楼板的安装:S3‑1先吊装楼板预制部分到指定安装位进行安装,与钢梁交接的位置搁置在铰接钢梁翼缘上,与组合墙交接的位置搁置在预先焊接好的L形连接件上;S3‑2楼板预制部分均安装完毕后,对整层楼板进行混凝土浇筑,形成楼板现浇部分,完整楼板的安装完成。
Installation method of corrugated steel plate composite wall structure system
The invention provides an installation method of a corrugated steel plate composite wall structure system. The installation method comprises the steps that 1, a corrugated steel plate composite wall is installed, specifically, S1-4, concrete pouring is conducted on a connecting area and the interior of a rectangular steel pipe through a grouting opening, and installation of the corrugated steel plate composite wall is completed; 2, a steel beam is installed, specifically, S2-1, a hinged steel beam needing to be connected to the composite wall is hoisted to a designated installation position, and S2-2, a steel beam web and a connecting plate welded to the rectangular steel pipe of the corrugated steel plate composite wall in advance are connected through high-strength bolts, so that connection between the hinged steel beam and the composite wall is completed; and 3, a floor slab is installed, specifically, S3-1, a prefabricated part of the floor slab is hoisted to the designated installation position to be installed, the position connected with the steel beam is placed on a flange of the hinged steel beam, and the position connected with the composite wall is placed on a pre-welded L-shaped connecting piece; and S3-2, after the prefabricated part of the floor slab is installed, concrete pouring is conducted on the whole floor slab, a cast-in-place part of the floor slab is formed, and installation of the complete floor slab is completed.
一种波纹钢板组合墙结构体系的安装方法,步骤:步骤1,进行波纹钢板组合墙的安装:S1‑4通过注浆口对连接区域以及矩形钢管内进行混凝土浇筑,完成此片波纹钢板组合墙的安装;步骤2,进行钢梁的安装:S2‑1吊装需连接到此片组合墙的铰接钢梁到指定的安装位;S2‑2用高强螺栓连接钢梁腹板和预先焊接在波纹钢板组合墙矩形钢管上的连接板,完成铰接钢梁与组合墙之间的连接;步骤3,进行楼板的安装:S3‑1先吊装楼板预制部分到指定安装位进行安装,与钢梁交接的位置搁置在铰接钢梁翼缘上,与组合墙交接的位置搁置在预先焊接好的L形连接件上;S3‑2楼板预制部分均安装完毕后,对整层楼板进行混凝土浇筑,形成楼板现浇部分,完整楼板的安装完成。
Installation method of corrugated steel plate composite wall structure system
一种波纹钢板组合墙结构体系的安装方法
LI GUOQIANG (Autor:in) / CHEN CHEN (Autor:in) / LIU QING (Autor:in) / LUO JINHUI (Autor:in)
20.04.2021
Patent
Elektronische Ressource
Chinesisch
Design method of corrugated steel plate shear wall and corrugated steel plate shear wall
Europäisches Patentamt | 2024
|Vertical corrugated CFRP-steel plate composite shear wall
Europäisches Patentamt | 2022
|Rectangular steel pipe-corrugated steel plate composite wall steel coupling beam coupled wall
Europäisches Patentamt | 2021
|