Optimized outlet shaft top bridge machine room structure
The invention discloses an optimized outlet shaft top bridge machine room structure. According to the optimized outlet shaft top bridge machine room structure, no additional hoisting equipment is needed for hoisting prefabricated parts, and the pouring time of a bridge machine room is greatly advanced. The outlet shaft top bridge machine room is of a multi-layer frame-shear wall structure and comprises a main bracket, a lining below the bracket, a lining above the bracket, middle columns, all floor beams and all floor plates; the main bracket is arranged between the lining above the bracket and the lining below the bracket; a plurality of middle columns are arranged in the inner side space defined by the lining below the bracket; the floor beams are arranged at the top ends of the middle columns and arranged in a staggered mode to form a latticed structure; and the layer plates are laid on the latticed structure formed by the floor beams.
本发明公开了一种优化的出线竖井顶部桥机室结构,无需增加额外吊运设备吊装预制构件,桥机室浇筑时间大幅提前的优化的出线竖井顶部桥机室结构。所述出线竖井顶部桥机室为多层框架‑剪力墙结构,所述出线竖井顶部桥机室包括主牛腿、牛腿以下衬砌、牛腿以上衬砌、中间柱、各层梁、各层板,所述主牛腿设置于牛腿以上衬砌和牛腿以下衬砌之间,牛腿以下衬砌包围的内侧空间设置若干中间柱,中间柱顶端设置各层梁,各层梁交错布置构成网格状结构,各层梁构成的网格结构上方铺设各层板。
Optimized outlet shaft top bridge machine room structure
The invention discloses an optimized outlet shaft top bridge machine room structure. According to the optimized outlet shaft top bridge machine room structure, no additional hoisting equipment is needed for hoisting prefabricated parts, and the pouring time of a bridge machine room is greatly advanced. The outlet shaft top bridge machine room is of a multi-layer frame-shear wall structure and comprises a main bracket, a lining below the bracket, a lining above the bracket, middle columns, all floor beams and all floor plates; the main bracket is arranged between the lining above the bracket and the lining below the bracket; a plurality of middle columns are arranged in the inner side space defined by the lining below the bracket; the floor beams are arranged at the top ends of the middle columns and arranged in a staggered mode to form a latticed structure; and the layer plates are laid on the latticed structure formed by the floor beams.
本发明公开了一种优化的出线竖井顶部桥机室结构,无需增加额外吊运设备吊装预制构件,桥机室浇筑时间大幅提前的优化的出线竖井顶部桥机室结构。所述出线竖井顶部桥机室为多层框架‑剪力墙结构,所述出线竖井顶部桥机室包括主牛腿、牛腿以下衬砌、牛腿以上衬砌、中间柱、各层梁、各层板,所述主牛腿设置于牛腿以上衬砌和牛腿以下衬砌之间,牛腿以下衬砌包围的内侧空间设置若干中间柱,中间柱顶端设置各层梁,各层梁交错布置构成网格状结构,各层梁构成的网格结构上方铺设各层板。
Optimized outlet shaft top bridge machine room structure
一种优化的出线竖井顶部桥机室结构
ZHAO XIULONG (Autor:in) / WAN XIANGBING (Autor:in) / FANG DAN (Autor:in) / LI LIANGQUAN (Autor:in) / BUYUEYIXIA (Autor:in) / SHAO BING (Autor:in) / CHEN DENGYI (Autor:in) / HONG JIAMIN (Autor:in) / CHEN PENG (Autor:in) / ZHONG DANING (Autor:in)
23.04.2021
Patent
Elektronische Ressource
Chinesisch
Diversion tunnel outlet vertical shaft energy dissipation structure
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Waterproof structure for shaft outlet hole of barrier gate case
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
Rye outlet bridge at Kensico reservoir
Engineering Index Backfile | 1911
|