The invention relates to a building external wall insulation board installation construction method. Alternate pasting equipment is used and comprises a base, a supporting plate, an alternate device, a conveying device and a lifting device. A driving motor is started, the output end of the driving motor drives a first gear to rotate, when the first gear rotates, a third gear is synchronously driven to rotate through a first rotating shaft, and when the third gear rotates, a second alternating rod is driven to move left and right through a second driving block, so that a first moving plate and a second moving plate are staggered to climb and adhere an external wall insulation board; and the output end of a conveying motor drives a rotating rod to rotate, when the rotating rod rotates, a swinging rod is driven to swing through a pushing frame, so that a pushing plate penetrates through a bearing plate to drive insulation boards on the bearing plate to be conveyed forwards in sequence, and the insulation boards are pasted to a wall body, so that a gluing roller and the pushing plate are matched to perform gluing and rolling brushing on the surface, attached to the wall surface, of the external wall insulation board to be pasted.
本发明涉及一种建筑外墙保温板安装施工方法,其使用了一种交替粘贴设备,该交替粘贴设备包括基座、支撑板、交替装置、输送装置、升降装置,通过开启驱动电机,驱动电机输出端带动第一齿轮转动,第一齿轮转动时通过第一转轴同步带动第三齿轮转动,第三齿轮转动时通过第二驱动块带动第二交替杆左右移动,以实现第一移动板与第二移动板错位对外墙保温板进行攀附粘贴,输送电机输出端带动转动杆转动,转动杆转动时通过推动架带动摆动杆摆动,从而实现推送板穿过承托板带动承托板上的各个保温板依次向前输送,使保温板与墙体粘贴,通过推送板向前移动,使涂胶辊与推送板配合对即将粘贴的外墙保温板与墙面贴合的一面进行涂胶滚刷。
The invention relates to a building external wall insulation board installation construction method. Alternate pasting equipment is used and comprises a base, a supporting plate, an alternate device, a conveying device and a lifting device. A driving motor is started, the output end of the driving motor drives a first gear to rotate, when the first gear rotates, a third gear is synchronously driven to rotate through a first rotating shaft, and when the third gear rotates, a second alternating rod is driven to move left and right through a second driving block, so that a first moving plate and a second moving plate are staggered to climb and adhere an external wall insulation board; and the output end of a conveying motor drives a rotating rod to rotate, when the rotating rod rotates, a swinging rod is driven to swing through a pushing frame, so that a pushing plate penetrates through a bearing plate to drive insulation boards on the bearing plate to be conveyed forwards in sequence, and the insulation boards are pasted to a wall body, so that a gluing roller and the pushing plate are matched to perform gluing and rolling brushing on the surface, attached to the wall surface, of the external wall insulation board to be pasted.
本发明涉及一种建筑外墙保温板安装施工方法,其使用了一种交替粘贴设备,该交替粘贴设备包括基座、支撑板、交替装置、输送装置、升降装置,通过开启驱动电机,驱动电机输出端带动第一齿轮转动,第一齿轮转动时通过第一转轴同步带动第三齿轮转动,第三齿轮转动时通过第二驱动块带动第二交替杆左右移动,以实现第一移动板与第二移动板错位对外墙保温板进行攀附粘贴,输送电机输出端带动转动杆转动,转动杆转动时通过推动架带动摆动杆摆动,从而实现推送板穿过承托板带动承托板上的各个保温板依次向前输送,使保温板与墙体粘贴,通过推送板向前移动,使涂胶辊与推送板配合对即将粘贴的外墙保温板与墙面贴合的一面进行涂胶滚刷。
Building external wall insulation board installation construction method
一种建筑外墙保温板安装施工方法
23.04.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Installation construction method of external wall insulation board
Europäisches Patentamt | 2021
|Building external wall insulation board construction method
Europäisches Patentamt | 2022
|Auxiliary installation device for building external wall insulation board
Europäisches Patentamt | 2024
|Installation and construction process of external wall insulation board