Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Gate pier hydraulic slip form construction complete equipment and construction method
The invention discloses gate pier hydraulic slip form construction complete equipment and a construction method, and relates to the technical field of construction of parts such as gate piers and side walls of hydraulic engineering concrete dams. The equipment comprises platform supporting frames symmetrically arranged across the left side and the right side of a gate pier, and a cross beam truss connected between the two platform supporting frames, wherein the left end and the right end, close to the platform supporting frames, of the cross beam truss are each provided with a corresponding lifting system used for hanging a slip form, and a distance between the left lifting system and the right lifting system can be relatively adjusted on the cross beam truss. The construction method comprises the steps of slip form assembly, platform supporting frame and cross beam truss installation, lifting system installation, hoisting in place, slip form measurement correction, reinforcing steel bar and embedded part installation, concrete pouring, concrete curing, supporting frame welding, slip form sliding, circulating sliding, and slip form dismounting and hoisting away. The equipment has the advantages that the structure is exquisite, circulating slip form construction is facilitated, and the construction method is an efficient and low-cost concrete construction process, and has the advantages of being high in construction speed, good in quality, low in cost and the like.
本发明公开了一种闸墩液压滑模施工成套设备以及施工工法,涉及水利工程混凝土坝的闸墩、侧墙等部位的施工技术领域。该设备包括横跨在闸墩左右两侧对称设置的平台支撑架、连接在两平台支撑架之间的横梁桁架,横梁桁架在靠近平台支撑架的左右两端分别设有用于挂载滑模的提升系统,左右两提升系统在横梁桁架上可相对调整距离。该工法包括步骤:滑模拼装→平台支撑架、横梁桁架安装→提升系统安装→吊装就位→滑模测量校正→钢筋、埋件安装→砼浇筑→砼养护→支撑架焊接→滑模滑升→循环滑升→滑模拆除、吊离。该设备具有结构精巧,便于循环滑模施工的优点,该施工工法是一种高效、低廉的混凝土施工工艺,具有施工速度快、质量好、成本低等优点。
Gate pier hydraulic slip form construction complete equipment and construction method
The invention discloses gate pier hydraulic slip form construction complete equipment and a construction method, and relates to the technical field of construction of parts such as gate piers and side walls of hydraulic engineering concrete dams. The equipment comprises platform supporting frames symmetrically arranged across the left side and the right side of a gate pier, and a cross beam truss connected between the two platform supporting frames, wherein the left end and the right end, close to the platform supporting frames, of the cross beam truss are each provided with a corresponding lifting system used for hanging a slip form, and a distance between the left lifting system and the right lifting system can be relatively adjusted on the cross beam truss. The construction method comprises the steps of slip form assembly, platform supporting frame and cross beam truss installation, lifting system installation, hoisting in place, slip form measurement correction, reinforcing steel bar and embedded part installation, concrete pouring, concrete curing, supporting frame welding, slip form sliding, circulating sliding, and slip form dismounting and hoisting away. The equipment has the advantages that the structure is exquisite, circulating slip form construction is facilitated, and the construction method is an efficient and low-cost concrete construction process, and has the advantages of being high in construction speed, good in quality, low in cost and the like.
本发明公开了一种闸墩液压滑模施工成套设备以及施工工法,涉及水利工程混凝土坝的闸墩、侧墙等部位的施工技术领域。该设备包括横跨在闸墩左右两侧对称设置的平台支撑架、连接在两平台支撑架之间的横梁桁架,横梁桁架在靠近平台支撑架的左右两端分别设有用于挂载滑模的提升系统,左右两提升系统在横梁桁架上可相对调整距离。该工法包括步骤:滑模拼装→平台支撑架、横梁桁架安装→提升系统安装→吊装就位→滑模测量校正→钢筋、埋件安装→砼浇筑→砼养护→支撑架焊接→滑模滑升→循环滑升→滑模拆除、吊离。该设备具有结构精巧,便于循环滑模施工的优点,该施工工法是一种高效、低廉的混凝土施工工艺,具有施工速度快、质量好、成本低等优点。
Gate pier hydraulic slip form construction complete equipment and construction method
一种闸墩液压滑模施工成套设备以及施工工法
WANG ZHIGANG (Autor:in) / WANG ZHU (Autor:in) / XIONG LIHUI (Autor:in) / DAI SHENFU (Autor:in)
27.04.2021
Patent
Elektronische Ressource
Chinesisch
Pier body lofting method for high pier slip form construction
Europäisches Patentamt | 2023
|Pier construction equipment and pier construction method
Europäisches Patentamt | 2021
|Rapid construction of tall bridge pier by hybrid-slip form method
British Library Conference Proceedings | 1996
|Water gate pier wall end form structure and construction method thereof
Europäisches Patentamt | 2021
|