Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Improvement method of steel bar truss floor support plate and steel bar truss floor support plate
The invention discloses an improvement method of a steel bar truss floor support plate and the steel bar truss floor support plate. The improvement method comprises the following steps that the steel bar truss floor support plate is divided into a formwork, a steel bar truss and a fastener, wherein the fastener is arranged to be a first body part and two second body parts, locking areas are arranged on the two sides of the first body part, after the first body part is connected with the formwork, gaps are formed between the two ends of the first body part and the formwork, and the second body parts are arranged to be capable of being matched with the first body part to lock a lower chord reinforcing steel bar after the lower chord reinforcing steel bar enters the locking areas and the second body parts are pressed into the gaps under the locking areas. According to the steel bar truss floor support plate, connection of the fasteners and the formwork and fixation of the steel bar truss can be conducted in two different procedures, the first body parts in the fasteners can be fixed to the formwork in advance, then the steel bar truss is fixed, and the steel bar truss floor support plate has the advantages of being more convenient to assemble, higher in efficiency and capable of reducing the labor cost of assembling.
本发明公开一种钢筋桁架楼承板的改进方法及钢筋桁架楼承板,该改进方法包括以下步骤:将钢筋桁架楼承板划分为模板、钢筋桁架和扣件;将扣件设置成第一本体部和两个第二本体部,在第一本体部的两侧均设置锁止区;将第一本体部设置成与模板连接之后,其两端与模板之间具有间隙;将第二本体部设置成在下弦钢筋进入锁止区之后,第二本体部被压入锁止区正下方的间隙内后,可与第一本体部的配合,将下弦钢筋锁止。本发明的钢筋桁架楼承板,能够将扣件与模板的连接以及钢筋桁架的固定分为两个不同的工序进行,使得可预先将扣件内的第一本体部先固定在模板上,再对钢筋桁架进行固定,具有组装更加方便、效率更高,降低组装的人工成本的优点。
Improvement method of steel bar truss floor support plate and steel bar truss floor support plate
The invention discloses an improvement method of a steel bar truss floor support plate and the steel bar truss floor support plate. The improvement method comprises the following steps that the steel bar truss floor support plate is divided into a formwork, a steel bar truss and a fastener, wherein the fastener is arranged to be a first body part and two second body parts, locking areas are arranged on the two sides of the first body part, after the first body part is connected with the formwork, gaps are formed between the two ends of the first body part and the formwork, and the second body parts are arranged to be capable of being matched with the first body part to lock a lower chord reinforcing steel bar after the lower chord reinforcing steel bar enters the locking areas and the second body parts are pressed into the gaps under the locking areas. According to the steel bar truss floor support plate, connection of the fasteners and the formwork and fixation of the steel bar truss can be conducted in two different procedures, the first body parts in the fasteners can be fixed to the formwork in advance, then the steel bar truss is fixed, and the steel bar truss floor support plate has the advantages of being more convenient to assemble, higher in efficiency and capable of reducing the labor cost of assembling.
本发明公开一种钢筋桁架楼承板的改进方法及钢筋桁架楼承板,该改进方法包括以下步骤:将钢筋桁架楼承板划分为模板、钢筋桁架和扣件;将扣件设置成第一本体部和两个第二本体部,在第一本体部的两侧均设置锁止区;将第一本体部设置成与模板连接之后,其两端与模板之间具有间隙;将第二本体部设置成在下弦钢筋进入锁止区之后,第二本体部被压入锁止区正下方的间隙内后,可与第一本体部的配合,将下弦钢筋锁止。本发明的钢筋桁架楼承板,能够将扣件与模板的连接以及钢筋桁架的固定分为两个不同的工序进行,使得可预先将扣件内的第一本体部先固定在模板上,再对钢筋桁架进行固定,具有组装更加方便、效率更高,降低组装的人工成本的优点。
Improvement method of steel bar truss floor support plate and steel bar truss floor support plate
一种钢筋桁架楼承板的改进方法及钢筋桁架楼承板
CHEN ZIQIANG (Autor:in)
27.04.2021
Patent
Elektronische Ressource
Chinesisch