Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Subway waiting area wall metal veneer installing system and installing method
The invention provides a subway waiting area wall metal veneer installing system. The subway waiting area wall metal veneer installing system is characterized by comprising a first installing piece and a second installing piece, wherein the first installing piece is partially fixed on a square tube, the second installing piece and the metal veneer are fixedly installed with each other, the first installing piece is provided with an installing part, the installing space is formed between the installing part and the square tube, the second installing piece is provided with a groove structure, and the second installing piece and the first installing piece are detachably installed in a mutual mode in a mode that the groove structure is placed on the installing part. According to the subway waiting area wall metal veneer installing system and the installing method, only a vertical keel is adopted, the vertical keel is connected to a hanging plate connecting piece on the back face of a veneer through a U-shaped connecting piece to achieve the purpose of veneer installation, and each veneer can be independently disassembled or assembled, so that the veneer is effectively prevented from generating resonance.
本发明提供了一种地铁候车区墙饰面金属板安装系统,其特征在于:包括第一安装件和第二安装件;其中,所述第一安装件,局部固定于方通上;所述第二安装件与饰面金属板相互固定的安装;所述第一安装件,具有安装部;所述安装部,与方通之间具有安装空间;所述第二安装件,具有凹槽结构,通过将凹槽结构搁置于安装部上的方式,实现与第一安装件可拆卸的相互安装。本发明只采用竖龙骨,竖龙骨上通过U型连接件和饰面板背面的挂板连接件进行连接来完成饰面板安装的目的。每块板都可以单独拆卸或安装,有效地防止了饰面板产生共振。
Subway waiting area wall metal veneer installing system and installing method
The invention provides a subway waiting area wall metal veneer installing system. The subway waiting area wall metal veneer installing system is characterized by comprising a first installing piece and a second installing piece, wherein the first installing piece is partially fixed on a square tube, the second installing piece and the metal veneer are fixedly installed with each other, the first installing piece is provided with an installing part, the installing space is formed between the installing part and the square tube, the second installing piece is provided with a groove structure, and the second installing piece and the first installing piece are detachably installed in a mutual mode in a mode that the groove structure is placed on the installing part. According to the subway waiting area wall metal veneer installing system and the installing method, only a vertical keel is adopted, the vertical keel is connected to a hanging plate connecting piece on the back face of a veneer through a U-shaped connecting piece to achieve the purpose of veneer installation, and each veneer can be independently disassembled or assembled, so that the veneer is effectively prevented from generating resonance.
本发明提供了一种地铁候车区墙饰面金属板安装系统,其特征在于:包括第一安装件和第二安装件;其中,所述第一安装件,局部固定于方通上;所述第二安装件与饰面金属板相互固定的安装;所述第一安装件,具有安装部;所述安装部,与方通之间具有安装空间;所述第二安装件,具有凹槽结构,通过将凹槽结构搁置于安装部上的方式,实现与第一安装件可拆卸的相互安装。本发明只采用竖龙骨,竖龙骨上通过U型连接件和饰面板背面的挂板连接件进行连接来完成饰面板安装的目的。每块板都可以单独拆卸或安装,有效地防止了饰面板产生共振。
Subway waiting area wall metal veneer installing system and installing method
一种地铁候车区墙饰面金属板安装系统及安装方法
XU ZHIQIANG (Autor:in) / CHEN WANGSHUANG (Autor:in) / WANG HONGCHENG (Autor:in) / ZHOU LIANG (Autor:in) / LIU GUOZHOU (Autor:in) / HU MINHUA (Autor:in)
27.04.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Installing Manufactured Stone Veneer
British Library Online Contents | 2000
|WALL MATERIAL INSTALLING STRUCTURE AND WALL MATERIAL INSTALLING METHOD
Europäisches Patentamt | 2020
|Method and system for installing push-pull type subway off-wall access door
Europäisches Patentamt | 2022
|