Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Vibration pile driver for bridge construction
The invention discloses a vibration pile driver for bridge construction. The vibration pile driver structurally comprises a walking base, an operation room, a driving table, a traction inhaul cable, a lifting plate, a pile hammer and a pile frame, wherein the operation room controls the driving table, the operation room and the driving table are installed on the walking base, the driving table is connected to the lifting plate through the traction inhaul cable, the pile hammer and the pile frame are movably connected to the lifting plate, and the pile hammer is mechanically connected with the pile frame; and the pile hammer comprises a soil guide device, a soil collecting cavity and a drill bit, the soil guide device is installed on the soil collecting cavity, the drill bit is arranged at the bottom of the soil collecting cavity, and the drill bit is arranged in the pile frame in a matched mode. The soil guide device is matched with the soil collecting cavity, a guide-out opening and a soil inlet formed in the soil guide device are connected with a soil guide pipe, the soil inlet is matched with the soil collecting cavity, soil in the soil collecting cavity is discharged out of the guide-out opening through the soil guide pipe via the soil inlet, the guide-out opening is connected to the exterior of the pile frame, continuous operation of soil guide of the pile hammer is achieved, one-time soil guide is achieved, and the pile driving efficiency is improved.
本发明公开了一种桥梁施工用振动打桩机,其结构包括行走底座、操作室、驱动台、牵引拉索、升降板、桩锤、桩架,操作室控制驱动台,操作室与驱动台安装在行走底座上,驱动台通过牵引拉索连接在升降板上,升降板上活动连接有桩锤与桩架,桩锤与桩架机械连接,桩锤包括导土装置、集土腔、钻头,导土装置安装在集土腔上,集土腔的底部设有钻头,钻头配合在桩架内,本发明导土装置与集土腔相配合,导土装置设置的导出口、进土口与导土管相连接,进土口与集土腔配合,通过进土口将集土腔内的泥土通过导土管至导出口排出,导出口接在桩架外,实现桩锤导土的连续性作业,实现一次性导土,提高打桩效率。
Vibration pile driver for bridge construction
The invention discloses a vibration pile driver for bridge construction. The vibration pile driver structurally comprises a walking base, an operation room, a driving table, a traction inhaul cable, a lifting plate, a pile hammer and a pile frame, wherein the operation room controls the driving table, the operation room and the driving table are installed on the walking base, the driving table is connected to the lifting plate through the traction inhaul cable, the pile hammer and the pile frame are movably connected to the lifting plate, and the pile hammer is mechanically connected with the pile frame; and the pile hammer comprises a soil guide device, a soil collecting cavity and a drill bit, the soil guide device is installed on the soil collecting cavity, the drill bit is arranged at the bottom of the soil collecting cavity, and the drill bit is arranged in the pile frame in a matched mode. The soil guide device is matched with the soil collecting cavity, a guide-out opening and a soil inlet formed in the soil guide device are connected with a soil guide pipe, the soil inlet is matched with the soil collecting cavity, soil in the soil collecting cavity is discharged out of the guide-out opening through the soil guide pipe via the soil inlet, the guide-out opening is connected to the exterior of the pile frame, continuous operation of soil guide of the pile hammer is achieved, one-time soil guide is achieved, and the pile driving efficiency is improved.
本发明公开了一种桥梁施工用振动打桩机,其结构包括行走底座、操作室、驱动台、牵引拉索、升降板、桩锤、桩架,操作室控制驱动台,操作室与驱动台安装在行走底座上,驱动台通过牵引拉索连接在升降板上,升降板上活动连接有桩锤与桩架,桩锤与桩架机械连接,桩锤包括导土装置、集土腔、钻头,导土装置安装在集土腔上,集土腔的底部设有钻头,钻头配合在桩架内,本发明导土装置与集土腔相配合,导土装置设置的导出口、进土口与导土管相连接,进土口与集土腔配合,通过进土口将集土腔内的泥土通过导土管至导出口排出,导出口接在桩架外,实现桩锤导土的连续性作业,实现一次性导土,提高打桩效率。
Vibration pile driver for bridge construction
一种桥梁施工用振动打桩机
HONG WENNA (Autor:in)
30.04.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Vibration pile driver with good stability for building construction
Europäisches Patentamt | 2021
|