Method for installing anchor bolt assembly of offshore wind turbine generator
The invention discloses a method for installing an anchor bolt assembly of an offshore wind turbine generator. The method comprises the steps that positioning anchor bolt assemblies and common anchor bolt assemblies are prepared; an anchor bolt cage construction supporting platform is prepared on land, lower anchor plates are installed, and the installed lower anchor plates are placed on the anchor bolt cage construction supporting platform through a crane; upper anchor plates are installed, the installed upper anchor plates are hoisted to the position over the lower anchor plates through the crane, and then the positioning anchor bolt assemblies are installed; the common anchor bolt assemblies are installed; and the installed anchor bolt cage is adjusted; the adjusted anchor bolt cage is hoisted to a ship, the anchor bolt cage is conveyed to an offshore machine position point of an offshore wind turbine foundation platform, supporting assemblies are installed on the lower anchor plates, then the anchor bolt cage is placed on embedded parts on the offshore wind turbine foundation platform, and the anchor bolt cage is fixed through the supporting assemblies; the embedded parts are arranged on the offshore wind turbine foundation platform in advance; and the anchor bolt cage is adjusted and fixed again. According to the method, the work intensity of constructors can be reduced, and the installation and construction efficiency of the anchor bolt assemblies is improved.
一种海上风电机组锚栓组合件安装方法,包括:准备定位锚栓组件和普通锚栓组件;在陆上准备锚栓笼施工支撑平台,进行下锚板的安装,通过吊车将安装好的下锚板放置在锚栓笼施工支撑平台上;进行上锚板的安装,用吊车将安装好的上锚板吊至下锚板正上方,然后安装定位锚栓组件;进行普通锚栓组件的安装;对安装好的锚栓笼进行调整;将调整好的锚栓笼吊装至船上,运送至海上风机基础平台的海上机位点,在下锚板上安装支撑组件,然后将锚栓笼放置在海上风机基础平台上的预埋件上并通过支撑组件进行固定;所述海上风机基础平台上预先设置好预埋件;再次对锚栓笼进行调整和固定。本发明能够降低施工人员工作强度,提高锚栓组合件安装施工效率。
Method for installing anchor bolt assembly of offshore wind turbine generator
The invention discloses a method for installing an anchor bolt assembly of an offshore wind turbine generator. The method comprises the steps that positioning anchor bolt assemblies and common anchor bolt assemblies are prepared; an anchor bolt cage construction supporting platform is prepared on land, lower anchor plates are installed, and the installed lower anchor plates are placed on the anchor bolt cage construction supporting platform through a crane; upper anchor plates are installed, the installed upper anchor plates are hoisted to the position over the lower anchor plates through the crane, and then the positioning anchor bolt assemblies are installed; the common anchor bolt assemblies are installed; and the installed anchor bolt cage is adjusted; the adjusted anchor bolt cage is hoisted to a ship, the anchor bolt cage is conveyed to an offshore machine position point of an offshore wind turbine foundation platform, supporting assemblies are installed on the lower anchor plates, then the anchor bolt cage is placed on embedded parts on the offshore wind turbine foundation platform, and the anchor bolt cage is fixed through the supporting assemblies; the embedded parts are arranged on the offshore wind turbine foundation platform in advance; and the anchor bolt cage is adjusted and fixed again. According to the method, the work intensity of constructors can be reduced, and the installation and construction efficiency of the anchor bolt assemblies is improved.
一种海上风电机组锚栓组合件安装方法,包括:准备定位锚栓组件和普通锚栓组件;在陆上准备锚栓笼施工支撑平台,进行下锚板的安装,通过吊车将安装好的下锚板放置在锚栓笼施工支撑平台上;进行上锚板的安装,用吊车将安装好的上锚板吊至下锚板正上方,然后安装定位锚栓组件;进行普通锚栓组件的安装;对安装好的锚栓笼进行调整;将调整好的锚栓笼吊装至船上,运送至海上风机基础平台的海上机位点,在下锚板上安装支撑组件,然后将锚栓笼放置在海上风机基础平台上的预埋件上并通过支撑组件进行固定;所述海上风机基础平台上预先设置好预埋件;再次对锚栓笼进行调整和固定。本发明能够降低施工人员工作强度,提高锚栓组合件安装施工效率。
Method for installing anchor bolt assembly of offshore wind turbine generator
一种海上风电机组锚栓组合件安装方法
ZHAO SHAOYAN (Autor:in) / BAI JIE (Autor:in) / DING YONGCHUN (Autor:in) / LIU PING (Autor:in) / WANG WANGQIU (Autor:in) / YANG ZHONGGUI (Autor:in) / WANG JIABIN (Autor:in) / WANG ZIQIANG (Autor:in) / LIU LEI (Autor:in) / TIAN JIANBAO (Autor:in)
30.04.2021
Patent
Elektronische Ressource
Chinesisch
Wind turbine generator anchor bolt assembly installing method
Europäisches Patentamt | 2021
|Anchor bolt installing structure and anchor bolt installing method
Europäisches Patentamt | 2020
|ANCHOR BOLT INSTALLING JIG AND ANCHOR BOLT INSTALLING METHOD
Europäisches Patentamt | 2024
|METHOD OF INSTALLING PARTS OF AN OFFSHORE WIND TURBINE GENERATOR
Europäisches Patentamt | 2021
|