Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Installation construction method for base plate low wall formworks
The invention provides an installation construction method for base plate low wall formworks. The method comprises the following construction steps that two groups of prepared to-be-installed guide wall formworks are hoisted into a pipe gallery groove body, so that the two groups of to-be-installed guide wall formworks are located on the sides, located at the extending end of a pipe gallery construction section, of installed guide wall formworks; a sliding platform is erected between the two groups of to-be-installed guide wall formworks; a calibration machine is hoisted on the upper top surfaces of the two groups of to-be-installed guide wall formworks, and a walking mechanism of the calibration machine is started; the to-be-installed guide wall formworks are enabled to fall down by utilizing lifting mechanisms, so that the lower surfaces of the to-be-installed guide wall formworks make contact with the inner bottom surface of the pipe gallery groove body; the adjusting ends of adjusting mechanisms are started, and in addition, the adjusting ends of the adjusting mechanisms are enabled to leave the sliding platform; and the to-be-installed guide wall formworks and the installed guide wall formworks are fixedly connected into a whole by utilizing a pipe gallery connecting frame mold. The method has the advantages that in this way, in the pipe gallery construction process, the situation that the guide wall formworks are moved and installed through manual operation can be reduced when the guide wall formworks are installed and adjusted, and therefore the construction efficiency of the guide wall formworks in the installation process is greatly improved.
本发明提供一种底板矮墙模安装施工方法,包括以下施工步骤:将两组制备好的待安装导墙模吊装至管廊槽体内,使得两组待安装导墙模位于已安装导墙模位于管廊施工段延伸端的一侧;在两组待安装导墙模之间架设滑动平台;在两组待安装导墙模的上顶面吊装校准机器,并启动校准机器的行走机构;利用提升机构将待安装导墙模落下,使得待安装导墙模的下表面接触管廊槽体的内底面;启动调节机构的调节端,并使所述调节机构的调节端离开滑动平台;利用管廊连接框模具将待安装导墙模和已安装导墙模进行固定连接为一体;由此实现了在管廊施工过程中,导墙模安装调节的时候能够减少人工操作移动并安装导墙模的情况,大大提高了导墙模在安装过程中的施工效率。
Installation construction method for base plate low wall formworks
The invention provides an installation construction method for base plate low wall formworks. The method comprises the following construction steps that two groups of prepared to-be-installed guide wall formworks are hoisted into a pipe gallery groove body, so that the two groups of to-be-installed guide wall formworks are located on the sides, located at the extending end of a pipe gallery construction section, of installed guide wall formworks; a sliding platform is erected between the two groups of to-be-installed guide wall formworks; a calibration machine is hoisted on the upper top surfaces of the two groups of to-be-installed guide wall formworks, and a walking mechanism of the calibration machine is started; the to-be-installed guide wall formworks are enabled to fall down by utilizing lifting mechanisms, so that the lower surfaces of the to-be-installed guide wall formworks make contact with the inner bottom surface of the pipe gallery groove body; the adjusting ends of adjusting mechanisms are started, and in addition, the adjusting ends of the adjusting mechanisms are enabled to leave the sliding platform; and the to-be-installed guide wall formworks and the installed guide wall formworks are fixedly connected into a whole by utilizing a pipe gallery connecting frame mold. The method has the advantages that in this way, in the pipe gallery construction process, the situation that the guide wall formworks are moved and installed through manual operation can be reduced when the guide wall formworks are installed and adjusted, and therefore the construction efficiency of the guide wall formworks in the installation process is greatly improved.
本发明提供一种底板矮墙模安装施工方法,包括以下施工步骤:将两组制备好的待安装导墙模吊装至管廊槽体内,使得两组待安装导墙模位于已安装导墙模位于管廊施工段延伸端的一侧;在两组待安装导墙模之间架设滑动平台;在两组待安装导墙模的上顶面吊装校准机器,并启动校准机器的行走机构;利用提升机构将待安装导墙模落下,使得待安装导墙模的下表面接触管廊槽体的内底面;启动调节机构的调节端,并使所述调节机构的调节端离开滑动平台;利用管廊连接框模具将待安装导墙模和已安装导墙模进行固定连接为一体;由此实现了在管廊施工过程中,导墙模安装调节的时候能够减少人工操作移动并安装导墙模的情况,大大提高了导墙模在安装过程中的施工效率。
Installation construction method for base plate low wall formworks
一种底板矮墙模安装施工方法
XU ZHENJIA (Autor:in) / LU QINGJIA (Autor:in)
30.04.2021
Patent
Elektronische Ressource
Chinesisch
Support frame for rapid installation of wall formworks
Europäisches Patentamt | 2015
|Construction method for shear wall formworks on two sides of expansion joint
Europäisches Patentamt | 2023
|