Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a prefabricated greening slope protection structure, and belongs to the field of slope support engineering. The prefabricated greening slope protection structure comprises a first fixed cross beam, a first fixed vertical beam, a second fixed cross beam and a second fixed vertical beam, wherein the first fixed cross beam is parallel to the second fixed cross beam; the first fixed vertical beam is parallel to the second fixed vertical beam; the first fixed cross beam, the first fixed vertical beam, the second fixed cross beam and the second fixed vertical beam form an enclosing structure for planting plants inside; a boss protruding outwards is arranged in the middle of the first fixed cross beam; a bulge protruding outwards is arranged in the middle of the first fixed vertical beam; a groove I recessed inwards is formed in the middle of the second fixed vertical beam; and a groove II recessed inwards is formed in the middle of the second fixed cross beam. The prefabricated greening slope protection structure is prefabricated in a prefabrication field and needs to be simply spliced and combined when transported to the field, so that a large amount of manpower and material resources are saved, the construction speed is high, the construction cost is reduced, the prefabricated greening slope protection structure can be recycled, and waste of resources is greatly reduced.
本发明公开了一种可预制的绿化边坡防护结构,属于边坡支护工程领域,包括第一固定横梁、第一固定竖梁、第二固定横梁和第二固定竖梁;第一固定横梁与第二固定横梁平行;第一固定竖梁和第二固定竖梁平行;第一固定横梁、第一固定竖梁、第二固定横梁和第二固定竖梁形成内部用于种植植株的包围结构;第一固定横梁的中间位置设置有向外凸出的凸台;第一固定竖梁的中间位置设置有向外凸出的凸起;第二固定竖梁的中间位置设置有向内凹进的凹槽I;第二固定横梁的中间位置设置有向内凹进的凹槽II;采用预制场预制,运输到现场需要简单的拼接组合即可,节约了大量的人力物力,且施工速度快,降低施工的成本,可以回收利用,极大的减少资源的浪费。
The invention discloses a prefabricated greening slope protection structure, and belongs to the field of slope support engineering. The prefabricated greening slope protection structure comprises a first fixed cross beam, a first fixed vertical beam, a second fixed cross beam and a second fixed vertical beam, wherein the first fixed cross beam is parallel to the second fixed cross beam; the first fixed vertical beam is parallel to the second fixed vertical beam; the first fixed cross beam, the first fixed vertical beam, the second fixed cross beam and the second fixed vertical beam form an enclosing structure for planting plants inside; a boss protruding outwards is arranged in the middle of the first fixed cross beam; a bulge protruding outwards is arranged in the middle of the first fixed vertical beam; a groove I recessed inwards is formed in the middle of the second fixed vertical beam; and a groove II recessed inwards is formed in the middle of the second fixed cross beam. The prefabricated greening slope protection structure is prefabricated in a prefabrication field and needs to be simply spliced and combined when transported to the field, so that a large amount of manpower and material resources are saved, the construction speed is high, the construction cost is reduced, the prefabricated greening slope protection structure can be recycled, and waste of resources is greatly reduced.
本发明公开了一种可预制的绿化边坡防护结构,属于边坡支护工程领域,包括第一固定横梁、第一固定竖梁、第二固定横梁和第二固定竖梁;第一固定横梁与第二固定横梁平行;第一固定竖梁和第二固定竖梁平行;第一固定横梁、第一固定竖梁、第二固定横梁和第二固定竖梁形成内部用于种植植株的包围结构;第一固定横梁的中间位置设置有向外凸出的凸台;第一固定竖梁的中间位置设置有向外凸出的凸起;第二固定竖梁的中间位置设置有向内凹进的凹槽I;第二固定横梁的中间位置设置有向内凹进的凹槽II;采用预制场预制,运输到现场需要简单的拼接组合即可,节约了大量的人力物力,且施工速度快,降低施工的成本,可以回收利用,极大的减少资源的浪费。
Prefabricated greening slope protection structure
一种可预制的绿化边坡防护结构
14.05.2021
Patent
Elektronische Ressource
Chinesisch
Water conservancy slope greening slope protection structure
Europäisches Patentamt | 2024
|Greening structure for slope protection of abrupt slope mountain
Europäisches Patentamt | 2022
|CUT SLOPE GREENING METHOD AND CUT SLOPE GREENING STRUCTURE
Europäisches Patentamt | 2019
|