Installation construction method of concrete prefabricated part
The invention relates to an installation construction method of a concrete prefabricated part. The concrete prefabricated part comprises a moving table, a control frame and an installation device; the control frame is fixedly installed at the upper end of the moving table, and the installation device is fixedly installed at the tail end of the control frame; and the control frame comprises a rotating rod, a rotating circular plate, a first motor, a bevel gear, a telescopic bracket, a fixed long plate, a fixed block, an electric telescopic rod and a fixed long column. According to the installation construction method, the displacement of the control frame and the installation device is controlled through the moving table, the installation position is controlled through the control frame, so that the displacement of concrete septic tank plates is controlled; the concrete septic tank plates are fixed through the installation device, meanwhile, concrete is introduced into the lower ends of the concrete septic tank plates, so that the concrete septic tank plates and the processing surfaces or the concrete septic tank plates are fixed, and in the whole process, the concrete septic tank plates do not need to be manually adjusted and fixed.
本发明涉及一种混凝土预制件安装施工方法,包括运动台、控制架与安装装置,所述运动台上端固定安装有控制架,控制架末端固定安装有安装装置,所述控制架包括转动杆、转动圆板、电机一、锥形齿轮、可伸缩支架、固定长板、固定块、电动伸缩杆与固定长柱,本发明通过运动台对控制架与安装装置的位移进行控制,通过控制架对安装位置进行控制,从而对混凝土化粪池板的位移进行控制,通过安装装置对混凝土化粪池板进行固定,同时将混凝土通入混凝土化粪池板下端,从而对混凝土化粪池板与加工面或者混凝土化粪池板与混凝土化粪池板之间进行固定,整个过程中,无需人工对混凝土化粪池板进行调整以及固定。
Installation construction method of concrete prefabricated part
The invention relates to an installation construction method of a concrete prefabricated part. The concrete prefabricated part comprises a moving table, a control frame and an installation device; the control frame is fixedly installed at the upper end of the moving table, and the installation device is fixedly installed at the tail end of the control frame; and the control frame comprises a rotating rod, a rotating circular plate, a first motor, a bevel gear, a telescopic bracket, a fixed long plate, a fixed block, an electric telescopic rod and a fixed long column. According to the installation construction method, the displacement of the control frame and the installation device is controlled through the moving table, the installation position is controlled through the control frame, so that the displacement of concrete septic tank plates is controlled; the concrete septic tank plates are fixed through the installation device, meanwhile, concrete is introduced into the lower ends of the concrete septic tank plates, so that the concrete septic tank plates and the processing surfaces or the concrete septic tank plates are fixed, and in the whole process, the concrete septic tank plates do not need to be manually adjusted and fixed.
本发明涉及一种混凝土预制件安装施工方法,包括运动台、控制架与安装装置,所述运动台上端固定安装有控制架,控制架末端固定安装有安装装置,所述控制架包括转动杆、转动圆板、电机一、锥形齿轮、可伸缩支架、固定长板、固定块、电动伸缩杆与固定长柱,本发明通过运动台对控制架与安装装置的位移进行控制,通过控制架对安装位置进行控制,从而对混凝土化粪池板的位移进行控制,通过安装装置对混凝土化粪池板进行固定,同时将混凝土通入混凝土化粪池板下端,从而对混凝土化粪池板与加工面或者混凝土化粪池板与混凝土化粪池板之间进行固定,整个过程中,无需人工对混凝土化粪池板进行调整以及固定。
Installation construction method of concrete prefabricated part
一种混凝土预制件安装施工方法
ZHU YIJING (Autor:in)
18.05.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Concrete prefabricated part installation construction system
Europäisches Patentamt | 2021
|Fabricated concrete prefabricated part installation construction method
Europäisches Patentamt | 2021
|Concrete prefabricated part outer window installation construction method
Europäisches Patentamt | 2022
|Installation and construction method of concrete prefabricated wall panel
Europäisches Patentamt | 2022
|Concrete prefabricated stair and installation and construction method thereof