Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a building curtain wall mounting and fixing support. The building curtain wall mounting and fixing support comprises a wall body, a first curtain plate is installed on the front side of the wall body, and a second curtain plate is connected to the rear side of the first curtain plate; a third curtain plate is connected to the front side of the first curtain plate, and a second fixing block is connected to the rear side of a first fixing block; fixing plates are installed on the outer surfaces of the second curtain plate and the third curtain plate in an attached mode, and screw rods are installed at the left end and the right end of each fixing plate in a penetrating mode; first connecting blocks are fixedly installed at the left end and the right end of the bottom of each fixing plate, and the tops of the third curtain plate, the first curtain plate and the second curtain plate are connected to a first connecting plate; a second connecting plate is connected to the upper portion of the first connecting plate, and a second connecting block is fixedly installed below the first fixing block; and a bearing block is connected to the right side of the second connecting block. According to the building curtain wall mounting and fixing support, curtain walls can be quickly spliced, and the bottoms of the curtain walls can be protected.
本发明公开了一种建筑幕墙安装固定支架,包括墙体,所述墙体的前侧安装有第一幕板,且第一幕板的后侧连接有第二幕板,所述第一幕板的前侧连接有第三幕板,所述第一固定块的后侧连接有第二固定块,所述第二幕板和第三幕板的外表面均贴合安装有固定板,且固定板的左右两端均贯穿安装有螺杆,所述固定板的底部左右两端均固定安装有第一连接块,所述第三幕板、第一幕板和第二幕板的顶部均连接有第一连接板,且第一连接板的上方连接有第二连接板,所述第一固定块的下方固定安装有第二连接块,且第二连接块的右侧连接有承载块。该建筑幕墙安装固定支架,不仅能够快速对幕墙进行拼接,而且能够对幕墙的底部进行保护。
The invention discloses a building curtain wall mounting and fixing support. The building curtain wall mounting and fixing support comprises a wall body, a first curtain plate is installed on the front side of the wall body, and a second curtain plate is connected to the rear side of the first curtain plate; a third curtain plate is connected to the front side of the first curtain plate, and a second fixing block is connected to the rear side of a first fixing block; fixing plates are installed on the outer surfaces of the second curtain plate and the third curtain plate in an attached mode, and screw rods are installed at the left end and the right end of each fixing plate in a penetrating mode; first connecting blocks are fixedly installed at the left end and the right end of the bottom of each fixing plate, and the tops of the third curtain plate, the first curtain plate and the second curtain plate are connected to a first connecting plate; a second connecting plate is connected to the upper portion of the first connecting plate, and a second connecting block is fixedly installed below the first fixing block; and a bearing block is connected to the right side of the second connecting block. According to the building curtain wall mounting and fixing support, curtain walls can be quickly spliced, and the bottoms of the curtain walls can be protected.
本发明公开了一种建筑幕墙安装固定支架,包括墙体,所述墙体的前侧安装有第一幕板,且第一幕板的后侧连接有第二幕板,所述第一幕板的前侧连接有第三幕板,所述第一固定块的后侧连接有第二固定块,所述第二幕板和第三幕板的外表面均贴合安装有固定板,且固定板的左右两端均贯穿安装有螺杆,所述固定板的底部左右两端均固定安装有第一连接块,所述第三幕板、第一幕板和第二幕板的顶部均连接有第一连接板,且第一连接板的上方连接有第二连接板,所述第一固定块的下方固定安装有第二连接块,且第二连接块的右侧连接有承载块。该建筑幕墙安装固定支架,不仅能够快速对幕墙进行拼接,而且能够对幕墙的底部进行保护。
Building curtain wall mounting and fixing support
一种建筑幕墙安装固定支架
QI MIAO (Autor:in)
25.05.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Building curtain wall buffering and damping fixing support and mounting method thereof
Europäisches Patentamt | 2023
|Building curtain wall mounting structure and building curtain wall mounting method
Europäisches Patentamt | 2022
|Building curtain wall mounting structure and building curtain wall mounting method
Europäisches Patentamt | 2020
|Building curtain wall mounting structure and building curtain wall mounting method
Europäisches Patentamt | 2024
|