Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a pump pipe hole reserving and post-pouring support-free device. The pump pipe hole reserving and post-pouring support-free device comprises a bottom plate, a structural concrete plate, a mounting assembly, a reserving hole mold and a gap plate, wherein the bottom plate is provided with a gap part, the gap part is provided with a gap in the thickness direction of the bottom plate, the gap part is provided with a bottom plate reserving hole penetrating through the thickness direction of the bottom plate, fixing pieces are arranged on the bottom plate, and the fixing pieces are located on the two sides of the gap part; the structural concrete plate is provided with a sleeve in the thickness direction, the sleeve can be arranged on the fixing piece in a sleeving mode, a concrete plate reserving hole is formed in the structural concrete plate, and the position of the concrete plate reserving hole is opposite to that of the bottom plate reserving hole; the mounting assembly is detachably mounted on the structural concrete plate and is connected and fastened with the fixing piece; the reserving hole mold can be arranged in the bottom plate reserving hole; the gap plate can be arranged in the gap of the gap part in a penetrating mode.
本发明公开了一种泵管洞口预留及后浇免支撑装置,包括:底板,所述底板具有间隙部,所述间隙部于所述底板的厚度方向开设有间隙,所述间隙部开设有贯穿所述底板厚度方向的底板预留洞;所述底板上设置有固定件,所述固定件位于所述间隙部的两侧;结构砼板,所述结构砼板沿厚度方向设置有套管,所述套管可套设于所述固定件上;所述结构砼板上开设有砼板预留洞,所述砼板预留洞与所述底板预留洞位置相对;安装组件,所述安装组件可拆卸安装于所述结构砼板上并于所述固定件连接紧固;预留洞模具,所述预留洞模具可设置于所述底板预留洞中;间隙板,所述间隙板可穿设于所述间隙部的间隙内。
The invention discloses a pump pipe hole reserving and post-pouring support-free device. The pump pipe hole reserving and post-pouring support-free device comprises a bottom plate, a structural concrete plate, a mounting assembly, a reserving hole mold and a gap plate, wherein the bottom plate is provided with a gap part, the gap part is provided with a gap in the thickness direction of the bottom plate, the gap part is provided with a bottom plate reserving hole penetrating through the thickness direction of the bottom plate, fixing pieces are arranged on the bottom plate, and the fixing pieces are located on the two sides of the gap part; the structural concrete plate is provided with a sleeve in the thickness direction, the sleeve can be arranged on the fixing piece in a sleeving mode, a concrete plate reserving hole is formed in the structural concrete plate, and the position of the concrete plate reserving hole is opposite to that of the bottom plate reserving hole; the mounting assembly is detachably mounted on the structural concrete plate and is connected and fastened with the fixing piece; the reserving hole mold can be arranged in the bottom plate reserving hole; the gap plate can be arranged in the gap of the gap part in a penetrating mode.
本发明公开了一种泵管洞口预留及后浇免支撑装置,包括:底板,所述底板具有间隙部,所述间隙部于所述底板的厚度方向开设有间隙,所述间隙部开设有贯穿所述底板厚度方向的底板预留洞;所述底板上设置有固定件,所述固定件位于所述间隙部的两侧;结构砼板,所述结构砼板沿厚度方向设置有套管,所述套管可套设于所述固定件上;所述结构砼板上开设有砼板预留洞,所述砼板预留洞与所述底板预留洞位置相对;安装组件,所述安装组件可拆卸安装于所述结构砼板上并于所述固定件连接紧固;预留洞模具,所述预留洞模具可设置于所述底板预留洞中;间隙板,所述间隙板可穿设于所述间隙部的间隙内。
Pump pipe hole reserving and post-pouring support-free device
一种泵管洞口预留及后浇免支撑装置
25.05.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Concrete delivery pump pipe floor hole reserving and fixing system
Europäisches Patentamt | 2023
|Post-pouring support-free construction method for hole
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|