Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Protection method for existing railway in jacking process of separated frame structure bridge
The invention relates to a protection method for an existing railway in the jacking process of a separated frame structure bridge. A D-shaped auxiliary beam can be rapidly longitudinally moved in place in a construction blocking point in a D-shaped auxiliary beam overall longitudinal moving mode, traveling interference is reduced, the project construction period is shortened, the project cost is saved, and the construction safety of a railway business line is ensured.
本发明涉及一种分离式框构桥顶进过程中既有铁路的防护方法,使用D型便梁整体纵移的方式可以在一个施工封锁点内进行快速D型便梁纵移就位,减少行车干扰,缩短了工程工期,节约工程成本,确保铁路营业线施工安全。
Protection method for existing railway in jacking process of separated frame structure bridge
The invention relates to a protection method for an existing railway in the jacking process of a separated frame structure bridge. A D-shaped auxiliary beam can be rapidly longitudinally moved in place in a construction blocking point in a D-shaped auxiliary beam overall longitudinal moving mode, traveling interference is reduced, the project construction period is shortened, the project cost is saved, and the construction safety of a railway business line is ensured.
本发明涉及一种分离式框构桥顶进过程中既有铁路的防护方法,使用D型便梁整体纵移的方式可以在一个施工封锁点内进行快速D型便梁纵移就位,减少行车干扰,缩短了工程工期,节约工程成本,确保铁路营业线施工安全。
Protection method for existing railway in jacking process of separated frame structure bridge
一种分离式框构桥顶进过程中既有铁路的防护方法
FANG ZHENMAO (Autor:in) / YU DEYANG (Autor:in) / LIU XINYUAN (Autor:in)
28.05.2021
Patent
Elektronische Ressource
Chinesisch
Frame-structure bridge jacking railway turnout reinforcing construction method
Europäisches Patentamt | 2020
|CONSTRUCTION METHOD FOR OVERHEAD JACKING OF MULTI-TRACK EXISTING RAILWAY OF FRAME BRIDGE
Europäisches Patentamt | 2023
|Jacking construction method and device for railway underneath passing frame structure bridge
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|