Construction method of large-span groove-crossing protection facility of important pipeline
The invention discloses a construction method of a large-span groove-crossing protection facility of an important pipeline, and relates to the technical field of pipeline groove-crossing protection facility construction methods. In order to improve the construction safety, the construction process is simplified. The construction method of the large-span groove-crossing protection facility comprises the following steps that construction preparation is conducted on a protection component; lower support primary and secondary keels and an upper steel truss component are blanked and prefabricated; earth at two sides of a concrete slab is pre-excavated; holes are pre-dug in the bottom of the concrete slab; the lower support secondary keel is perforated in place; the lower support main keel is installed; the upper steel truss is installed and fixed; and a lower support supporting system is tightened. In the process of laying the plain concrete slabs, the earth around the plain concrete slabs is excavated in a manual and small machine tool excavation mode, and after the earth is excavated to the elevation required by the design, a small tamping machine is used for tamping and compacting the earth, so that a stable operation platform can be formed, the earth at the two sides of the pipeline is manually pre-excavated, and the pipeline can be kept stable in the excavation process.
本发明公开了一种重要管线大跨度跨槽保护设施的施工方法,涉及管线跨槽保护设施施工方法技术领域;为了提高施工的安全性,简化施工工艺;该种大跨度跨槽保护设施的施工方法包括以下步骤:对保护组件进行施工准备;下托主次龙骨、上部钢桁架构件下料、预制;混凝土板两侧土方预挖;混凝土板底预挖孔洞;下托次龙骨穿孔就位;下托主龙骨安装;上部钢桁架安装固定;收紧下托支承体系。本发明在对素混凝土板进行铺设的过程中,素混凝土板周围的土方开挖采用人工加小型机具开挖的方式,开挖至设计要求标高后,使用小型打夯机将土体夯压密实,从而可以形成稳定操作平台,对管线两侧土方进行人工预开挖,可以确保管线开挖过程中保持稳定。
Construction method of large-span groove-crossing protection facility of important pipeline
The invention discloses a construction method of a large-span groove-crossing protection facility of an important pipeline, and relates to the technical field of pipeline groove-crossing protection facility construction methods. In order to improve the construction safety, the construction process is simplified. The construction method of the large-span groove-crossing protection facility comprises the following steps that construction preparation is conducted on a protection component; lower support primary and secondary keels and an upper steel truss component are blanked and prefabricated; earth at two sides of a concrete slab is pre-excavated; holes are pre-dug in the bottom of the concrete slab; the lower support secondary keel is perforated in place; the lower support main keel is installed; the upper steel truss is installed and fixed; and a lower support supporting system is tightened. In the process of laying the plain concrete slabs, the earth around the plain concrete slabs is excavated in a manual and small machine tool excavation mode, and after the earth is excavated to the elevation required by the design, a small tamping machine is used for tamping and compacting the earth, so that a stable operation platform can be formed, the earth at the two sides of the pipeline is manually pre-excavated, and the pipeline can be kept stable in the excavation process.
本发明公开了一种重要管线大跨度跨槽保护设施的施工方法,涉及管线跨槽保护设施施工方法技术领域;为了提高施工的安全性,简化施工工艺;该种大跨度跨槽保护设施的施工方法包括以下步骤:对保护组件进行施工准备;下托主次龙骨、上部钢桁架构件下料、预制;混凝土板两侧土方预挖;混凝土板底预挖孔洞;下托次龙骨穿孔就位;下托主龙骨安装;上部钢桁架安装固定;收紧下托支承体系。本发明在对素混凝土板进行铺设的过程中,素混凝土板周围的土方开挖采用人工加小型机具开挖的方式,开挖至设计要求标高后,使用小型打夯机将土体夯压密实,从而可以形成稳定操作平台,对管线两侧土方进行人工预开挖,可以确保管线开挖过程中保持稳定。
Construction method of large-span groove-crossing protection facility of important pipeline
一种重要管线大跨度跨槽保护设施的施工方法
CAI GUIXIN (Autor:in) / LI CHUNSONG (Autor:in) / HUANG PINGZU (Autor:in) / HE YUXUN (Autor:in) / HUANG ZHILIN (Autor:in)
01.06.2021
Patent
Elektronische Ressource
Chinesisch
Channel-crossing large-span trestle construction method
Europäisches Patentamt | 2020
|Studies on a Large-Span Beam String Pipeline Crossing
British Library Online Contents | 2008
|Studies on a Large-Span Beam String Pipeline Crossing
Online Contents | 2008
|Plain concrete slab structure for long-span cross-groove protection of pipeline