Anti-progressive-collapse method suitable for steel-concrete composite structure
The invention provides an anti-progressive-collapse method suitable for a steel-concrete composite structure. The method comprises the steps that 1, anchor cables, anchorage devices and fixing parts are prepared; 2, through holes are formed in the two sides of the joint of a steel pipe concrete column and a steel beam and used for allowing the anchor cables to penetrate through; 3, the two sides of a web of the I-shaped steel beam are each provided with one anchor cable, and the anchor cables are fixed to the two sides of the web through the fixing parts; 4, the anchorage devices are used for locking and fixing the anchor cables to prevent slipping; 5, the fixing parts are welded between an upper flange of the steel beam and the web and used for limiting lateral movement of the anchor cables; and 6, the anchor cables are in a loose and non-stressed state at ordinary times, the anchor cables are stressed and clamped only when the middle column fails and enters the large-deformation catenary stage, and the structure is prevented from progressive collapse. When the middle column fails and enters the large-deformation catenary stage, the anchor cables and side columns form an effective pulling structure, and the structure is prevented from progressive collapse.
一种适用于钢‑混凝土组合结构抗连续倒塌方法,步骤1,备好锚索、锚具和固定件;步骤2,在钢管混凝土柱与钢梁连接两侧处开设有贯穿孔,用于穿过锚索;步骤3,工字型钢梁腹板两侧分别布设一根锚索,采用固定件固定锚索于腹板两侧;步骤4,采用锚具用于锁紧固定锚索,防止滑脱;步骤5,采用固定件焊接于钢梁上翼缘与腹板之间,用于限制锚索的侧向移动;步骤6,所述锚索在平时为松弛不受力状态,当中柱失效进入大变形的悬链线阶段才会受力卡紧,防止结构出现连续性倒塌。在中柱失效进入大变形的悬链线阶段,锚索和边柱形成有效的拉结结构,防止结构出现连续性倒塌。
Anti-progressive-collapse method suitable for steel-concrete composite structure
The invention provides an anti-progressive-collapse method suitable for a steel-concrete composite structure. The method comprises the steps that 1, anchor cables, anchorage devices and fixing parts are prepared; 2, through holes are formed in the two sides of the joint of a steel pipe concrete column and a steel beam and used for allowing the anchor cables to penetrate through; 3, the two sides of a web of the I-shaped steel beam are each provided with one anchor cable, and the anchor cables are fixed to the two sides of the web through the fixing parts; 4, the anchorage devices are used for locking and fixing the anchor cables to prevent slipping; 5, the fixing parts are welded between an upper flange of the steel beam and the web and used for limiting lateral movement of the anchor cables; and 6, the anchor cables are in a loose and non-stressed state at ordinary times, the anchor cables are stressed and clamped only when the middle column fails and enters the large-deformation catenary stage, and the structure is prevented from progressive collapse. When the middle column fails and enters the large-deformation catenary stage, the anchor cables and side columns form an effective pulling structure, and the structure is prevented from progressive collapse.
一种适用于钢‑混凝土组合结构抗连续倒塌方法,步骤1,备好锚索、锚具和固定件;步骤2,在钢管混凝土柱与钢梁连接两侧处开设有贯穿孔,用于穿过锚索;步骤3,工字型钢梁腹板两侧分别布设一根锚索,采用固定件固定锚索于腹板两侧;步骤4,采用锚具用于锁紧固定锚索,防止滑脱;步骤5,采用固定件焊接于钢梁上翼缘与腹板之间,用于限制锚索的侧向移动;步骤6,所述锚索在平时为松弛不受力状态,当中柱失效进入大变形的悬链线阶段才会受力卡紧,防止结构出现连续性倒塌。在中柱失效进入大变形的悬链线阶段,锚索和边柱形成有效的拉结结构,防止结构出现连续性倒塌。
Anti-progressive-collapse method suitable for steel-concrete composite structure
一种适用于钢-混凝土组合结构抗连续倒塌方法
LI YANG (Autor:in) / KONG QINGZHAO (Autor:in) / YUAN CHENG (Autor:in)
04.06.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Progressive Collapse Resistance of Steel-Concrete Composite Floors
Online Contents | 2010
|Progressive Collapse Resistance of Steel-Concrete Composite Floors
British Library Online Contents | 2010
|Progressive collapse: the case of composite steel-concrete frames
British Library Conference Proceedings | 2017
|Progressive collapse mitigation approaches for steel-concrete composite buildings
Springer Verlag | 2015
|