Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dry-hanging inhaul cable ceramic brick curtain wall and construction method thereof
The invention relates to a dry-hanging inhaul cable ceramic brick curtain wall and a construction method thereof. The dry-hanging inhaul cable ceramic brick curtain wall comprises a fixing plate, an inhaul cable and a plurality of ceramic bricks, wherein the fixing plate is fixedly connected with a building wall surface; the inhaul cable is connected with the fixing plate; the ceramic bricks are arranged on the inhaul cable in a sleeving mode and can move relative to the inhaul cable; the dry-hanging inhaul cable ceramic brick curtain wall further comprises locking pieces in butt joint with the ceramic bricks; and the locking pieces are used for locking the ceramic bricks with the positions adjusted on the inhaul cable. The inhaul cable is fixedly connected with the fixing plate, then the ceramic bricks are arranged on the inhaul cable in the sleeving mode, the ceramic bricks move on the inhaul cable to adjust the mounting positions, mounting is more flexible, the situation that embedded parts or keels are mounted in a building is avoided, the flatness of the whole curtain wall is improved, wet operation is avoided, and the construction period is shortened.
本申请涉及一种干挂拉索陶砖幕墙及其施工方法,包括:固定板,与建筑物墙面固定连接;拉索,与固定板连接;及若干个陶砖,套设在拉索上且可相对于拉索移动;干挂拉索陶砖幕墙还包括与每个陶砖对接的锁定件,锁定件用以将调节位置后的陶砖锁定在拉索上。通过将拉索与固定板固定连接,然后将陶砖套设在拉索上,并且陶砖在拉索上移动以调节安装位置,安装更为灵活,避免了在建筑物内安装预埋件或龙骨,提高了整体幕墙的平整度,且避免了湿法作业,缩短了施工周期。
Dry-hanging inhaul cable ceramic brick curtain wall and construction method thereof
The invention relates to a dry-hanging inhaul cable ceramic brick curtain wall and a construction method thereof. The dry-hanging inhaul cable ceramic brick curtain wall comprises a fixing plate, an inhaul cable and a plurality of ceramic bricks, wherein the fixing plate is fixedly connected with a building wall surface; the inhaul cable is connected with the fixing plate; the ceramic bricks are arranged on the inhaul cable in a sleeving mode and can move relative to the inhaul cable; the dry-hanging inhaul cable ceramic brick curtain wall further comprises locking pieces in butt joint with the ceramic bricks; and the locking pieces are used for locking the ceramic bricks with the positions adjusted on the inhaul cable. The inhaul cable is fixedly connected with the fixing plate, then the ceramic bricks are arranged on the inhaul cable in the sleeving mode, the ceramic bricks move on the inhaul cable to adjust the mounting positions, mounting is more flexible, the situation that embedded parts or keels are mounted in a building is avoided, the flatness of the whole curtain wall is improved, wet operation is avoided, and the construction period is shortened.
本申请涉及一种干挂拉索陶砖幕墙及其施工方法,包括:固定板,与建筑物墙面固定连接;拉索,与固定板连接;及若干个陶砖,套设在拉索上且可相对于拉索移动;干挂拉索陶砖幕墙还包括与每个陶砖对接的锁定件,锁定件用以将调节位置后的陶砖锁定在拉索上。通过将拉索与固定板固定连接,然后将陶砖套设在拉索上,并且陶砖在拉索上移动以调节安装位置,安装更为灵活,避免了在建筑物内安装预埋件或龙骨,提高了整体幕墙的平整度,且避免了湿法作业,缩短了施工周期。
Dry-hanging inhaul cable ceramic brick curtain wall and construction method thereof
干挂拉索陶砖幕墙及其施工方法
WANG LEI (Autor:in) / WU ZHIJIE (Autor:in) / LU KANG (Autor:in) / YANG XIAODONG (Autor:in) / QIN LISHENG (Autor:in)
04.06.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Curtain wall construction inhaul cable hanging basket device and using method thereof
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Sun-shading inhaul cable argil plate brick curtain wall structure
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|