Curtain wall construction method
The invention discloses a curtain wall construction method. The method comprises the following steps of S1, drilling holes in a roof of a high-rise building through an electric drill, then mounting a support, meanwhile, drilling holes in the ground to mount a support, and enabling the two supports to be located at opposite positions. According to the curtain wall construction method, the novel construction method is adopted, curtain walls are mounted on a fixing frame on the ground in advance, the curtain walls do not need to be combined in the high altitude, and therefore the curtain walls only need to be mounted in the high altitude, the time for a worker to stay in the high altitude is greatly shortened, the workers are protected, and the curtain wall mounting efficiency can be improved; and meanwhile, a rope is wound around the waist of the worker, the end of the rope is mounted on the roof, the worker can be protected, and by means of the construction mode, the mounting efficiency is improved, and the worker is better protected.
本发明公开了一种幕墙施工方法,包括如下步骤:S1:在高楼的楼顶上,先通过电钻进行钻孔,然后安装支架,同时在地面上钻孔来安装支架,且两个支架处于相对的位置。该种幕墙施工方法,通过采用新的施工方法,由于提前在地面上将幕墙安装在固定架上,无需在高空中处对幕墙进行组合,这样只需要在高空中对幕墙安装,大大的减少工作人员在高空的时间,对工作人员进行保护,以及可以提高安装幕墙的效率,同时在工作人员的腰部缠绕绳索,并且绳索的端部安装在楼顶,可以对工作人员进行保护,采用这种施工方式,提高安装的效率和对工作人员更好的保护。
Curtain wall construction method
The invention discloses a curtain wall construction method. The method comprises the following steps of S1, drilling holes in a roof of a high-rise building through an electric drill, then mounting a support, meanwhile, drilling holes in the ground to mount a support, and enabling the two supports to be located at opposite positions. According to the curtain wall construction method, the novel construction method is adopted, curtain walls are mounted on a fixing frame on the ground in advance, the curtain walls do not need to be combined in the high altitude, and therefore the curtain walls only need to be mounted in the high altitude, the time for a worker to stay in the high altitude is greatly shortened, the workers are protected, and the curtain wall mounting efficiency can be improved; and meanwhile, a rope is wound around the waist of the worker, the end of the rope is mounted on the roof, the worker can be protected, and by means of the construction mode, the mounting efficiency is improved, and the worker is better protected.
本发明公开了一种幕墙施工方法,包括如下步骤:S1:在高楼的楼顶上,先通过电钻进行钻孔,然后安装支架,同时在地面上钻孔来安装支架,且两个支架处于相对的位置。该种幕墙施工方法,通过采用新的施工方法,由于提前在地面上将幕墙安装在固定架上,无需在高空中处对幕墙进行组合,这样只需要在高空中对幕墙安装,大大的减少工作人员在高空的时间,对工作人员进行保护,以及可以提高安装幕墙的效率,同时在工作人员的腰部缠绕绳索,并且绳索的端部安装在楼顶,可以对工作人员进行保护,采用这种施工方式,提高安装的效率和对工作人员更好的保护。
Curtain wall construction method
一种幕墙施工方法
LIU JIUQIANG (Autor:in) / LIAO SHANGKUI (Autor:in) / HONG QIMING (Autor:in) / ZHUANG JIACHANG (Autor:in) / HU HONGXIA (Autor:in)
04.06.2021
Patent
Elektronische Ressource
Chinesisch
CONSTRUCTION METHOD FOR CURTAIN WALL AND CURTAIN WALL
Europäisches Patentamt | 2018
|Curtain wall fixing device and curtain wall construction method
Europäisches Patentamt | 2022
|Curtain wall fixing device and curtain wall construction method
Europäisches Patentamt | 2023
|Steel curtain wall and steel curtain wall construction method
Europäisches Patentamt | 2018
|