Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of maintainable assembly type floating equipment foundation
The invention provides a construction method of a maintainable assembly type floating equipment foundation. The construction method comprises the following steps that S1, peripheral reverse ridge construction is conducted; S2, foundation structure layer construction is conducted; S3, surveying and setting out are conducted, and a vibration isolation layer is installed; S4, a sound insulation layer is installed; S5, a hoistable floating platform is manufactured; S6, the floating platform is hoisted; S7, an assembly type strip-shaped foundation is manufactured; S8, the assembly type strip-shaped foundation is hoisted; S9, a TEL spring shock absorber, a drainage hose and horizontally-arranged springs are installed; S10, a channel steel frame is installed; and S11, equipment is installed and debugged. The maintainable assembly type floating equipment foundation is high in sound insulation and shock absorption capacity, good in waterproof performance and easy to overhaul.
本发明提供一种可维护组装式浮筑设备基础的施工方法,包括下述步骤:S1、四周反坎施工;S2、基础构造层施工;S3、测量放线,安装隔振层;S4、安装隔声层;S5、制作可吊装浮动地台;S6、进行浮动地台吊装;S7、制作装配式条形基础;S8、进行装配式条形基础吊装;S9、安装TEL弹簧减振器、排水软管、水平对置弹簧;S10、安装槽钢架;S11、安装设备,并进行调试。本发明隔声与减振能力强,防水性能好,且易于检修。
Construction method of maintainable assembly type floating equipment foundation
The invention provides a construction method of a maintainable assembly type floating equipment foundation. The construction method comprises the following steps that S1, peripheral reverse ridge construction is conducted; S2, foundation structure layer construction is conducted; S3, surveying and setting out are conducted, and a vibration isolation layer is installed; S4, a sound insulation layer is installed; S5, a hoistable floating platform is manufactured; S6, the floating platform is hoisted; S7, an assembly type strip-shaped foundation is manufactured; S8, the assembly type strip-shaped foundation is hoisted; S9, a TEL spring shock absorber, a drainage hose and horizontally-arranged springs are installed; S10, a channel steel frame is installed; and S11, equipment is installed and debugged. The maintainable assembly type floating equipment foundation is high in sound insulation and shock absorption capacity, good in waterproof performance and easy to overhaul.
本发明提供一种可维护组装式浮筑设备基础的施工方法,包括下述步骤:S1、四周反坎施工;S2、基础构造层施工;S3、测量放线,安装隔振层;S4、安装隔声层;S5、制作可吊装浮动地台;S6、进行浮动地台吊装;S7、制作装配式条形基础;S8、进行装配式条形基础吊装;S9、安装TEL弹簧减振器、排水软管、水平对置弹簧;S10、安装槽钢架;S11、安装设备,并进行调试。本发明隔声与减振能力强,防水性能好,且易于检修。
Construction method of maintainable assembly type floating equipment foundation
一种可维护组装式浮筑设备基础的施工方法
CHEN GANG (Autor:in) / XU XIAOHUI (Autor:in) / WANG RITONG (Autor:in) / LI XIANG (Autor:in) / QUAN YOUWEI (Autor:in)
08.06.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
EASILY MAINTAINABLE ASSEMBLY-TYPE BRIDGE EXPANSION JOINT STRUCTURE AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2025
|Assembly type maintainable elastic floor system and mounting method thereof
Europäisches Patentamt | 2020
|Electromechanical equipment floating foundation and construction method thereof
Europäisches Patentamt | 2024
|