Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated superimposed shear wall mounting system and method
The invention discloses a prefabricated superimposed shear wall mounting system and method, and belongs to the field of buildings. The prefabricated superimposed shear wall mounting system comprises a prefabricated superimposed shear wall body, a bottom supporting piece and a top supporting piece; a steel pipe edge constraint piece is arranged on the side surface of the prefabricated superimposed shear wall; a first group of bolt holes are formed in two unit parts of the bottom supporting piece at a certain height from the bottom surface, are connected together through a first group of through bolts, and keep a certain distance between the two unit parts; the bottom of the prefabricated superimposed shear wall is placed on the first group of through bolts and is clamped and fixed, and a plugging side mold is arranged at the bottom of the prefabricated superimposed shear wall; and the top supporting piece is mounted at the top of the prefabricated superimposed shear wall, and an upper-layer prefabricated superimposed floor slab is placed on the top face of the top supporting piece. The temporary supports on the construction site are greatly reduced, the construction space is saved, the construction efficiency is improved, the cost is reduced, and the temporary supports can be detached and reused.
本发明公开了一种预制叠合剪力墙安装系统及安装方法,属于建筑领域。其包括预制叠合剪力墙、底部支撑件和顶部支撑件;预制叠合剪力墙侧面上设置钢管边缘约束构件;底部支撑件的两个单元部件距离底面一定高度处开设有第一组螺栓孔,通过第一组对穿螺栓连接在一起且保持两个单元部件间隔一定距离;预制叠合剪力墙底部放置在第一组对穿螺栓上并被夹紧固定,预制叠合剪力墙底部设置有封堵侧模;顶部支撑件安装在预制叠合剪力墙顶部,顶部支撑件的顶面上放置有上层预制叠合楼板。本发明大幅度减少了施工现场临时支撑的存在,节约施工空间,提高施工效率,减少成本,可拆卸重复利用。
Prefabricated superimposed shear wall mounting system and method
The invention discloses a prefabricated superimposed shear wall mounting system and method, and belongs to the field of buildings. The prefabricated superimposed shear wall mounting system comprises a prefabricated superimposed shear wall body, a bottom supporting piece and a top supporting piece; a steel pipe edge constraint piece is arranged on the side surface of the prefabricated superimposed shear wall; a first group of bolt holes are formed in two unit parts of the bottom supporting piece at a certain height from the bottom surface, are connected together through a first group of through bolts, and keep a certain distance between the two unit parts; the bottom of the prefabricated superimposed shear wall is placed on the first group of through bolts and is clamped and fixed, and a plugging side mold is arranged at the bottom of the prefabricated superimposed shear wall; and the top supporting piece is mounted at the top of the prefabricated superimposed shear wall, and an upper-layer prefabricated superimposed floor slab is placed on the top face of the top supporting piece. The temporary supports on the construction site are greatly reduced, the construction space is saved, the construction efficiency is improved, the cost is reduced, and the temporary supports can be detached and reused.
本发明公开了一种预制叠合剪力墙安装系统及安装方法,属于建筑领域。其包括预制叠合剪力墙、底部支撑件和顶部支撑件;预制叠合剪力墙侧面上设置钢管边缘约束构件;底部支撑件的两个单元部件距离底面一定高度处开设有第一组螺栓孔,通过第一组对穿螺栓连接在一起且保持两个单元部件间隔一定距离;预制叠合剪力墙底部放置在第一组对穿螺栓上并被夹紧固定,预制叠合剪力墙底部设置有封堵侧模;顶部支撑件安装在预制叠合剪力墙顶部,顶部支撑件的顶面上放置有上层预制叠合楼板。本发明大幅度减少了施工现场临时支撑的存在,节约施工空间,提高施工效率,减少成本,可拆卸重复利用。
Prefabricated superimposed shear wall mounting system and method
预制叠合剪力墙安装系统及安装方法
CHEN XIAO (Autor:in) / HOU HETAO (Autor:in) / MOU YINLIN (Autor:in) / ZHANG CHUNLIANG (Autor:in) / YANG FUHANG (Autor:in) / LI ZEYU (Autor:in)
08.06.2021
Patent
Elektronische Ressource
Chinesisch
Superimposed integral type prefabricated shear wall edge component and mounting method
Europäisches Patentamt | 2021
|Prefabricated high-strength fiber cement formwork superimposed shear wall
Europäisches Patentamt | 2021
|Superimposed shear wall mechanism and superimposed shear wall
Europäisches Patentamt | 2024
|Superimposed shear wall based on semi-prefabricated super-tough reinforced concrete
Europäisches Patentamt | 2015
|