The invention relates to a cement pavement slab staggering treatment structure and a construction method. The slab staggering treatment structure comprises a base layer and an old surface layer; the slab staggering treatment structure further comprises a repairing layer, a slab staggering connecting part, a leveling layer and a new surface layer. The old surface layer comprises an in-situ plate and a sinking plate; a pulling device is arranged in the repairing layer and the slab staggering connecting part; anti-upheaval devices are arranged on the in-situ plate and the leveling layer. The slab staggering positions of the old surface layer are connected into a whole, so that the problem of reflection to the new surface layer from a penetrating crack is effectively solved; an anti-upheaval device is arranged to effectively relieve the generation of upheaval diseases of a new surface layer; while the original cement concrete surface layer is treated, the void of the base layer below the staggered slab junction gap is treated, so that the generation of the pavement structure crack is delayed.
本发明涉及一种水泥路面错台处治结构及施工方法。所述错台处治结构包括基层和旧面层;所述错台处治结构还包括修复层、错台连接件、找平层和新面层;所述旧面层包括原位板和下沉板;所述修复层和错台连接件中设置有拉结装置;在所述原位板和找平层上设置有抗拥包装置。本发明将旧面层的错台位置连接为一个整体,有效解决贯穿裂缝向新面层反射的问题;设置的抗拥包装置有效缓解新面层拥包病害的产生;在处治原有水泥混凝土面层的同时,对错台交界缝隙下方的基层脱空进行处治,有助于延缓路面结构裂缝的产生。
The invention relates to a cement pavement slab staggering treatment structure and a construction method. The slab staggering treatment structure comprises a base layer and an old surface layer; the slab staggering treatment structure further comprises a repairing layer, a slab staggering connecting part, a leveling layer and a new surface layer. The old surface layer comprises an in-situ plate and a sinking plate; a pulling device is arranged in the repairing layer and the slab staggering connecting part; anti-upheaval devices are arranged on the in-situ plate and the leveling layer. The slab staggering positions of the old surface layer are connected into a whole, so that the problem of reflection to the new surface layer from a penetrating crack is effectively solved; an anti-upheaval device is arranged to effectively relieve the generation of upheaval diseases of a new surface layer; while the original cement concrete surface layer is treated, the void of the base layer below the staggered slab junction gap is treated, so that the generation of the pavement structure crack is delayed.
本发明涉及一种水泥路面错台处治结构及施工方法。所述错台处治结构包括基层和旧面层;所述错台处治结构还包括修复层、错台连接件、找平层和新面层;所述旧面层包括原位板和下沉板;所述修复层和错台连接件中设置有拉结装置;在所述原位板和找平层上设置有抗拥包装置。本发明将旧面层的错台位置连接为一个整体,有效解决贯穿裂缝向新面层反射的问题;设置的抗拥包装置有效缓解新面层拥包病害的产生;在处治原有水泥混凝土面层的同时,对错台交界缝隙下方的基层脱空进行处治,有助于延缓路面结构裂缝的产生。
Cement pavement slab staggering treatment structure and construction method
一种水泥路面错台处治结构及施工方法
LU LIN (Autor:in)
18.06.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Pavement slab staggering repairing device and pavement repairing method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2022
|Rapid detection device for slab staggering height difference of cement concrete pavement plate
Europäisches Patentamt | 2022
|Pavement inspection well cover slab staggering protection device and using method thereof
Europäisches Patentamt | 2024
|Fabricated cement concrete pavement slab and construction method
Europäisches Patentamt | 2021
|