Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
High-precision rapid installation and construction method for high-quality special-shaped stone kerb
The invention discloses a high-precision rapid installation construction method for a high-quality special-shaped stone kerb, belongs to the field of road construction, and solves the problems that an existing construction method is low in installation precision, low in speed and large in waste. The construction method comprises the following steps: acquiring the road shape of a construction road on which the curb needs to be mounted; optimally designing curbs according to the road shape, and obtaining a curb model library; selecting curb models in a curb model library for typesetting and modeling to obtain a real scene model of a road shape; sequentially numbering curbs in the real scene model according to a preset direction to obtain a numbered curb model; manufacturing curb stone entities corresponding to the curb stone models with the numbers, and marking the curb stone entities with corresponding numbers and installation directions to obtain curb stone entities with marks; transporting the curb entity with the mark to the construction road through a curb transporting device; and sequentially mounting the curb entities with the marks according to the numbers and the mounting direction. The construction method is high in installation precision and high in speed, and curbs are not wasted.
本申请公开了一种高品质异型石材路缘石高精度快速安装施工工法,属于道路施工领域,解决了现有工法安装精度不高,速度慢,浪费大的问题。该工法包括:获取需要安装路缘石的施工道路的道路形状;根据道路形状优化设计路缘石,并得到路缘石模型库;选取路缘石模型库中的路缘石模型进行排版并建模得到道路形状的实景模型;将实景模型中的路缘石按预设方向顺序编号得到带编号路缘石模型;分别制作带编号路缘石模型对应的路缘石实体,并对路缘石实体标注相应的编号和安装方向得到带标注路缘石实体;通过路缘石运输装置将带标注路缘石实体运输至施工道路处;按编号和安装方向依次安装带标注路缘石实体。本申请的工法安装精度高、速度快、不浪费路缘石。
High-precision rapid installation and construction method for high-quality special-shaped stone kerb
The invention discloses a high-precision rapid installation construction method for a high-quality special-shaped stone kerb, belongs to the field of road construction, and solves the problems that an existing construction method is low in installation precision, low in speed and large in waste. The construction method comprises the following steps: acquiring the road shape of a construction road on which the curb needs to be mounted; optimally designing curbs according to the road shape, and obtaining a curb model library; selecting curb models in a curb model library for typesetting and modeling to obtain a real scene model of a road shape; sequentially numbering curbs in the real scene model according to a preset direction to obtain a numbered curb model; manufacturing curb stone entities corresponding to the curb stone models with the numbers, and marking the curb stone entities with corresponding numbers and installation directions to obtain curb stone entities with marks; transporting the curb entity with the mark to the construction road through a curb transporting device; and sequentially mounting the curb entities with the marks according to the numbers and the mounting direction. The construction method is high in installation precision and high in speed, and curbs are not wasted.
本申请公开了一种高品质异型石材路缘石高精度快速安装施工工法,属于道路施工领域,解决了现有工法安装精度不高,速度慢,浪费大的问题。该工法包括:获取需要安装路缘石的施工道路的道路形状;根据道路形状优化设计路缘石,并得到路缘石模型库;选取路缘石模型库中的路缘石模型进行排版并建模得到道路形状的实景模型;将实景模型中的路缘石按预设方向顺序编号得到带编号路缘石模型;分别制作带编号路缘石模型对应的路缘石实体,并对路缘石实体标注相应的编号和安装方向得到带标注路缘石实体;通过路缘石运输装置将带标注路缘石实体运输至施工道路处;按编号和安装方向依次安装带标注路缘石实体。本申请的工法安装精度高、速度快、不浪费路缘石。
High-precision rapid installation and construction method for high-quality special-shaped stone kerb
一种高品质异型石材路缘石高精度快速安装施工工法
LI WENJIE (Autor:in) / ZHANG HUIBIN (Autor:in) / CHEN SHIXUAN (Autor:in) / SHAO HUI (Autor:in) / WANG BAOCHENG (Autor:in) / WANG CHAOYANG (Autor:in) / QIANG JUNBO (Autor:in) / DU WUJUN (Autor:in) / LI TING (Autor:in)
18.06.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Special-shaped stone kerb high-precision rapid installation device and construction method thereof
Europäisches Patentamt | 2022
|Stone-like concrete kerb capable of replacing natural stone kerb and preparation method
Europäisches Patentamt | 2021
|High-grade sand kerb stone and preparation method thereof
Europäisches Patentamt | 2016
|