Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway bridge roadbed pavement construction device and construction method thereof
The invention discloses a highway bridge subgrade pavement construction device and a construction method thereof. The highway bridge subgrade pavement construction device comprises a frame, four evenly-distributed moving wheels are arranged at the bottom of the frame, a trailer mechanism is arranged on the front side of the frame, and a dust collection mechanism is arranged at the position, below the trailer mechanism, of the front side of the frame; a material collecting box is fixedly installed in an inner cavity of the vehicle frame, the top end of the material collecting box extends to the position above the frame, a feeding port is formed in one side of the material collecting box, and a discharging port is formed in the bottom of the material collecting box. And the paving speed and efficiency are improved, so that the concrete can achieve a better paving effect, the pavement construction quality is ensured, and the use requirements of people can be better met.
本发明公开了一种公路桥梁路基路面施工装置及其施工方法,包括车架,所述车架底部设置有四个均匀分布的移动轮,所述车架的前侧设置有拖车机构,且所述车架的前侧位于拖车机构的下方设置有吸尘机构,所述车架的内腔固定安装有集料箱,所述集料箱的顶端延伸至车架的上方,且所述集料箱的一侧设置有进料口,所述集料箱的底部设置有出料口,本发明自动化程度高,大大降低了工人的劳动强度,同时节省了人工成本,提高了铺设的速度与效率,便于能够使得混凝土达到更好的铺设效果,从而确保了路面施工的质量,进而便于能够更好的满足人们的使用需求。
Highway bridge roadbed pavement construction device and construction method thereof
The invention discloses a highway bridge subgrade pavement construction device and a construction method thereof. The highway bridge subgrade pavement construction device comprises a frame, four evenly-distributed moving wheels are arranged at the bottom of the frame, a trailer mechanism is arranged on the front side of the frame, and a dust collection mechanism is arranged at the position, below the trailer mechanism, of the front side of the frame; a material collecting box is fixedly installed in an inner cavity of the vehicle frame, the top end of the material collecting box extends to the position above the frame, a feeding port is formed in one side of the material collecting box, and a discharging port is formed in the bottom of the material collecting box. And the paving speed and efficiency are improved, so that the concrete can achieve a better paving effect, the pavement construction quality is ensured, and the use requirements of people can be better met.
本发明公开了一种公路桥梁路基路面施工装置及其施工方法,包括车架,所述车架底部设置有四个均匀分布的移动轮,所述车架的前侧设置有拖车机构,且所述车架的前侧位于拖车机构的下方设置有吸尘机构,所述车架的内腔固定安装有集料箱,所述集料箱的顶端延伸至车架的上方,且所述集料箱的一侧设置有进料口,所述集料箱的底部设置有出料口,本发明自动化程度高,大大降低了工人的劳动强度,同时节省了人工成本,提高了铺设的速度与效率,便于能够使得混凝土达到更好的铺设效果,从而确保了路面施工的质量,进而便于能够更好的满足人们的使用需求。
Highway bridge roadbed pavement construction device and construction method thereof
一种公路桥梁路基路面施工装置及其施工方法
JING CONGMING (Autor:in)
22.06.2021
Patent
Elektronische Ressource
Chinesisch
Highway bridge roadbed pavement construction device and construction method thereof
Europäisches Patentamt | 2023
|Highway bridge roadbed pavement and construction method thereof
Europäisches Patentamt | 2022
|Highway bridge roadbed pavement construction device and construction method
Europäisches Patentamt | 2022
|Highway bridge roadbed and pavement construction device
Europäisches Patentamt | 2020
|Highway bridge roadbed pavement auxiliary construction device and construction method thereof
Europäisches Patentamt | 2023
|