Steel structure building installation construction method and system
The invention discloses a steel structure building installation construction method. The method comprises the following steps that S1, a steel structure plant and part of a reinforced concrete frame structure are determined; S2, system preparation for hoisting is carried out; S3, construction is divided into hoisting stages according to the production process and engineering characteristics, line production is organized between the stages, and after the stages are completed, the human image recognition technology is used for handing over recognized handover personnel in time; S4, a rail presser base is welded to a crane beam flange by adopting a minimum arching height process; and S5, a steel structure and a light steel structure enclosure attached to the steel structure are assembled, and a plurality of leading machines are organized for synchronous hoisting in a partitioned mode.
本发明公开了一种钢结构建筑安装施工方法,包括以下步骤:S1、确认钢结构厂房和部分钢筋混凝土框架结构;S2、进行吊装的系统准备;S3、根据生产工艺和工程特点将施工划分吊装阶段,阶段间组织流水作业,阶段完成后使用人像识别技术,对识别出的交接人员及时交接;S4、采取最小起拱高度工艺将压轨器底座焊接在吊车梁翼缘;S5、组装钢结构及其所附轻质钢结构围护并组织多台主导机械分区同步吊装。
Steel structure building installation construction method and system
The invention discloses a steel structure building installation construction method. The method comprises the following steps that S1, a steel structure plant and part of a reinforced concrete frame structure are determined; S2, system preparation for hoisting is carried out; S3, construction is divided into hoisting stages according to the production process and engineering characteristics, line production is organized between the stages, and after the stages are completed, the human image recognition technology is used for handing over recognized handover personnel in time; S4, a rail presser base is welded to a crane beam flange by adopting a minimum arching height process; and S5, a steel structure and a light steel structure enclosure attached to the steel structure are assembled, and a plurality of leading machines are organized for synchronous hoisting in a partitioned mode.
本发明公开了一种钢结构建筑安装施工方法,包括以下步骤:S1、确认钢结构厂房和部分钢筋混凝土框架结构;S2、进行吊装的系统准备;S3、根据生产工艺和工程特点将施工划分吊装阶段,阶段间组织流水作业,阶段完成后使用人像识别技术,对识别出的交接人员及时交接;S4、采取最小起拱高度工艺将压轨器底座焊接在吊车梁翼缘;S5、组装钢结构及其所附轻质钢结构围护并组织多台主导机械分区同步吊装。
Steel structure building installation construction method and system
一种钢结构建筑安装施工方法及系统
TAN MINGYAN (Autor:in) / ZHU JUNCHENG (Autor:in) / HE HAIBO (Autor:in) / DENG YUNBIN (Autor:in) / LIN GUANGMING (Autor:in)
22.06.2021
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|Ridge waterproof construction building steel structure installation method
Europäisches Patentamt | 2020
|Prefabricated steel structure building installation construction technology
Europäisches Patentamt | 2024
|Prefabricated steel structure building installation construction process
Europäisches Patentamt | 2022
|