Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
High-rise building curtain wall glass installation construction method
The invention relates to a high-rise building curtain wall glass installation construction method. The method mainly comprises the following steps of adsorption operation, lifting operation, abutting operation, installation operation and other procedures. Used building curtain wall glass conveying equipment comprises a bottom plate, a lifting device, an adsorption device and an abutting device. The method can solve the following problems existing in existing glass curtain wall installation and conveying that a, during traditional curtain wall glass installation and conveying, a worker needs to hold curtain wall glass with the hand and stand on a lifting platform to convey the curtain wall glass to the installation position, potential safety hazards of manual curtain wall glass conveying are large, the phenomenon that the curtain wall glass falls off frequently occurs, the curtain wall glass is damaged, and unnecessary economic losses are caused; and b, existing curtain wall glass conveying equipment cannot stably convey the curtain wall glass to the proper installation position, adsorption to the curved-surface curtain wall glass is not stable, the curved-surface curtain wall glass at the corner cannot be conveyed, and the glass curtain wall conveying efficiency is reduced.
本发明涉及一种高层建筑幕墙玻璃安装施工方法,主要包括以下步骤,吸附作业、升降作业、抵紧作业以及安装作业等多种工序,使用到的建筑幕墙玻璃输送设备包括底板、升降装置、吸附装置和抵紧装置,本发明可以解决现有的玻璃幕墙安装输送时存在的以下难题,a,传统的幕墙玻璃安装输送时,需要人工手持幕墙玻璃站在升降平台上将幕墙玻璃输送到安装位置,人工输送幕墙玻璃安全隐患较大,并且经常发生幕墙玻璃掉落的现象,使得幕墙玻璃破损,造成不必要的经济损失;b,现有的幕墙玻璃输送设备不能稳定的将幕墙玻璃输送到合适的安装位置,对曲面的幕墙玻璃吸附不稳定,不能对弯角处的曲面幕墙玻璃进行输送作业,降低了玻璃幕墙的输送效率。
High-rise building curtain wall glass installation construction method
The invention relates to a high-rise building curtain wall glass installation construction method. The method mainly comprises the following steps of adsorption operation, lifting operation, abutting operation, installation operation and other procedures. Used building curtain wall glass conveying equipment comprises a bottom plate, a lifting device, an adsorption device and an abutting device. The method can solve the following problems existing in existing glass curtain wall installation and conveying that a, during traditional curtain wall glass installation and conveying, a worker needs to hold curtain wall glass with the hand and stand on a lifting platform to convey the curtain wall glass to the installation position, potential safety hazards of manual curtain wall glass conveying are large, the phenomenon that the curtain wall glass falls off frequently occurs, the curtain wall glass is damaged, and unnecessary economic losses are caused; and b, existing curtain wall glass conveying equipment cannot stably convey the curtain wall glass to the proper installation position, adsorption to the curved-surface curtain wall glass is not stable, the curved-surface curtain wall glass at the corner cannot be conveyed, and the glass curtain wall conveying efficiency is reduced.
本发明涉及一种高层建筑幕墙玻璃安装施工方法,主要包括以下步骤,吸附作业、升降作业、抵紧作业以及安装作业等多种工序,使用到的建筑幕墙玻璃输送设备包括底板、升降装置、吸附装置和抵紧装置,本发明可以解决现有的玻璃幕墙安装输送时存在的以下难题,a,传统的幕墙玻璃安装输送时,需要人工手持幕墙玻璃站在升降平台上将幕墙玻璃输送到安装位置,人工输送幕墙玻璃安全隐患较大,并且经常发生幕墙玻璃掉落的现象,使得幕墙玻璃破损,造成不必要的经济损失;b,现有的幕墙玻璃输送设备不能稳定的将幕墙玻璃输送到合适的安装位置,对曲面的幕墙玻璃吸附不稳定,不能对弯角处的曲面幕墙玻璃进行输送作业,降低了玻璃幕墙的输送效率。
High-rise building curtain wall glass installation construction method
一种高层建筑幕墙玻璃安装施工方法
ZHAO RUIBIN (Autor:in)
29.06.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Super high-rise inhaul cable curtain wall glass clamp and curtain wall glass installation method
Europäisches Patentamt | 2020
|Building glass curtain wall installation construction equipment and method
Europäisches Patentamt | 2024
|Fixing equipment for high-rise building curtain wall installation
Europäisches Patentamt | 2024
|