Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
High pile plate-soil combined road
The invention provides a high pile plate-soil combined road. The high pile plate-soil combined road comprises a high pile plate structure and an overlying combined soil layer, the high pile plate structure is composed of a prefabricated concrete beam plate and piles arranged in a net shape. Connecting holes are reserved in the prefabricated concrete beam plates, and reinforcing steel bars are arranged on pile heads of the pile columns and penetrate into the connecting holes to form an integral frame structure. The overlying combined soil layer comprises a cement stabilized macadam layer and a pavement surface structure layer, and the cement stabilized macadam layer and the pavement surface structure layer are laid on the precast concrete beam slab from bottom to top. The high pile plate-soil combined road is a novel green road construction mode combining a structure and a road surface, the advantages of a bridge structure of a soil filling road are effectively considered, and the unique advantages of the novel road are generated.
本发明提供了一种高桩板‑土组合道路,包括高桩板结构和上覆组合土层;其中高桩板结构由预制混凝土梁板和网状布置的桩柱组成;预制混凝土梁板上留有连接孔,桩柱的桩头设有钢筋,钢筋穿入连接孔内形成框架整体结构;上覆组合土层包括水泥稳定碎石层和路面沥表结构层,水泥稳定碎石层和路面沥表结构层从下至上铺设在预制混凝土梁板上。高桩板‑土组合道路是一种采用结构和路面相结合的新型绿色道路建造模式,有效兼顾了填土道路的桥梁结构的优点,并且产生了该新型道路自己的独特优点。
High pile plate-soil combined road
The invention provides a high pile plate-soil combined road. The high pile plate-soil combined road comprises a high pile plate structure and an overlying combined soil layer, the high pile plate structure is composed of a prefabricated concrete beam plate and piles arranged in a net shape. Connecting holes are reserved in the prefabricated concrete beam plates, and reinforcing steel bars are arranged on pile heads of the pile columns and penetrate into the connecting holes to form an integral frame structure. The overlying combined soil layer comprises a cement stabilized macadam layer and a pavement surface structure layer, and the cement stabilized macadam layer and the pavement surface structure layer are laid on the precast concrete beam slab from bottom to top. The high pile plate-soil combined road is a novel green road construction mode combining a structure and a road surface, the advantages of a bridge structure of a soil filling road are effectively considered, and the unique advantages of the novel road are generated.
本发明提供了一种高桩板‑土组合道路,包括高桩板结构和上覆组合土层;其中高桩板结构由预制混凝土梁板和网状布置的桩柱组成;预制混凝土梁板上留有连接孔,桩柱的桩头设有钢筋,钢筋穿入连接孔内形成框架整体结构;上覆组合土层包括水泥稳定碎石层和路面沥表结构层,水泥稳定碎石层和路面沥表结构层从下至上铺设在预制混凝土梁板上。高桩板‑土组合道路是一种采用结构和路面相结合的新型绿色道路建造模式,有效兼顾了填土道路的桥梁结构的优点,并且产生了该新型道路自己的独特优点。
High pile plate-soil combined road
一种高桩板-土组合道路
YANG DAHAI (Autor:in) / LI JIANLUAN (Autor:in) / WANG ZHITIAN (Autor:in) / YANG KAI (Autor:in) / ZHU JUN (Autor:in) / ZHOU YUN (Autor:in)
06.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Soil layer pile plate buttress combined retaining wall
Europäisches Patentamt | 2015
|Combined shallow soft soil pile and large-pile-diameter deep pile foundation
Europäisches Patentamt | 2022
|