Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
High-speed train vase pier body maintenance and modification multifunctional working platform
The invention discloses a high-speed train vase pier body maintenance and modification multifunctional working platform which comprises a pier body, the pier body is sleeved with a working platform body, a plurality of universal nozzles are installed on the inner side of the working platform body, a circle of guardrail is fixedly connected to the outer side of the working platform body, and rollers are rotationally installed on the two sides of the top of the pier body body; a worm and gear speed reducer is installed at the top of the pier body and is in transmission connection with a first steel wire rope. According to the device, winding and loosening of the first steel wire rope are achieved through the worm and gear speed reducer, so that lifting of the working platform in the vertical direction is achieved, meanwhile, water flow is sprayed to the surface of the pier body through the universal nozzle, comprehensive maintenance is conducted on the pier body, and the worm and gear speed reducer is remotely controlled through the wireless remote controller. And due to the self-locking principle between the worm gear and the worm, the working platform cannot automatically slide down under the condition of power failure, and the safety is improved.
本发明公开了一种高铁花瓶墩墩身养护修饰多功能工作平台,包括墩身本体,所述墩身本体外侧套接有工作平台,所述工作平台内侧安装有多个万向喷嘴,所述工作平台外侧固定连接有一圈护栏,所述墩身本体顶部两侧转动安装有辊筒,所述墩身本体顶部安装有蜗轮蜗杆减速机,所述蜗轮蜗杆减速机传动连接有第一钢丝绳。本发明中,通过蜗轮蜗杆减速机实现第一钢丝绳的收卷与放松,从而实现工作平台在竖直方向上的升降,同时,通过万向喷嘴向墩身本体表面喷射水流,对墩身进行全面养护,其中,蜗轮蜗杆减速机通过无线遥控器远程控制,且由于蜗轮和蜗杆之间的自锁原理,在断电情况下不会工作平台自动下滑,提高了安全性。
High-speed train vase pier body maintenance and modification multifunctional working platform
The invention discloses a high-speed train vase pier body maintenance and modification multifunctional working platform which comprises a pier body, the pier body is sleeved with a working platform body, a plurality of universal nozzles are installed on the inner side of the working platform body, a circle of guardrail is fixedly connected to the outer side of the working platform body, and rollers are rotationally installed on the two sides of the top of the pier body body; a worm and gear speed reducer is installed at the top of the pier body and is in transmission connection with a first steel wire rope. According to the device, winding and loosening of the first steel wire rope are achieved through the worm and gear speed reducer, so that lifting of the working platform in the vertical direction is achieved, meanwhile, water flow is sprayed to the surface of the pier body through the universal nozzle, comprehensive maintenance is conducted on the pier body, and the worm and gear speed reducer is remotely controlled through the wireless remote controller. And due to the self-locking principle between the worm gear and the worm, the working platform cannot automatically slide down under the condition of power failure, and the safety is improved.
本发明公开了一种高铁花瓶墩墩身养护修饰多功能工作平台,包括墩身本体,所述墩身本体外侧套接有工作平台,所述工作平台内侧安装有多个万向喷嘴,所述工作平台外侧固定连接有一圈护栏,所述墩身本体顶部两侧转动安装有辊筒,所述墩身本体顶部安装有蜗轮蜗杆减速机,所述蜗轮蜗杆减速机传动连接有第一钢丝绳。本发明中,通过蜗轮蜗杆减速机实现第一钢丝绳的收卷与放松,从而实现工作平台在竖直方向上的升降,同时,通过万向喷嘴向墩身本体表面喷射水流,对墩身进行全面养护,其中,蜗轮蜗杆减速机通过无线遥控器远程控制,且由于蜗轮和蜗杆之间的自锁原理,在断电情况下不会工作平台自动下滑,提高了安全性。
High-speed train vase pier body maintenance and modification multifunctional working platform
一种高铁花瓶墩墩身养护修饰多功能工作平台
HUANG XIAOHUA (Autor:in) / CHEN YIZHAO (Autor:in) / ZHANG JINGBO (Autor:in) / CHAI BO (Autor:in) / ZHANG SUFANG (Autor:in) / LI JUNJIE (Autor:in) / ZHANG XIUXIANG (Autor:in)
06.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Splicing operation platform for vase pier construction
Europäisches Patentamt | 2024
|