Water storage dry well construction method
The invention relates to the technical field of water well construction, in particular to a water storage dry well construction method. The water storage dry well construction method comprises the following steps that a foundation pit is excavated, specifically, the contour of a well is excavated according to a design drawing; brick paving is conducted, specifically, bricks are piled layer by layer from the bottom of the foundation pit in the circumferential direction of the foundation pit to form a well wall, and a gap between the well wall and the foundation pit is backfilled in the well wall piling process, wherein the well wall sequentially comprises a main body section, a closing-up section and a well mouth section from bottom to top, the main body section and the well mouth section are both of a columnar structure, and the diameter of the well mouth section is smaller than that of the main body section; and waterproof layers are brushed, specifically, the multiple waterproof layers are arranged at the bottom of the well wall and the bottom of the foundation pit. According to the water storage dry well construction method, the structure of the main body section, the closing-up section and the well mouth section is adopted, backfilling is conducted between the well wall and the foundation pit, the dry well of the structure is provided with a large containing cavity and a small opening end, the occupied area is reduced, and the manufacturing cost is low.
本发明涉及水井建造技术领域,尤其是涉及一种蓄水旱井建造方法。该方法包括以下步骤:挖掘基坑:根据设计图纸,挖出井的轮廓;铺砖:从基坑的底部沿基坑的周向逐层垒砖制成井墙,在垒制井墙过程中对井墙和基坑之间的缝隙进行回填;井墙由下到上依次为主体段、收口段和井口段,主体段和井口段均为柱状结构,且井口段的直径小于主体段的直径;涂刷防水层:在井墙和基坑底部设置多层防水层。该方法采用的结构为主体段、收口段和井口段,并对井墙和基坑之间进行回填,此种结构的旱井具有较大的容纳空腔,较小的开口端,减少了占地面积,并且具有较小的制造成本。
Water storage dry well construction method
The invention relates to the technical field of water well construction, in particular to a water storage dry well construction method. The water storage dry well construction method comprises the following steps that a foundation pit is excavated, specifically, the contour of a well is excavated according to a design drawing; brick paving is conducted, specifically, bricks are piled layer by layer from the bottom of the foundation pit in the circumferential direction of the foundation pit to form a well wall, and a gap between the well wall and the foundation pit is backfilled in the well wall piling process, wherein the well wall sequentially comprises a main body section, a closing-up section and a well mouth section from bottom to top, the main body section and the well mouth section are both of a columnar structure, and the diameter of the well mouth section is smaller than that of the main body section; and waterproof layers are brushed, specifically, the multiple waterproof layers are arranged at the bottom of the well wall and the bottom of the foundation pit. According to the water storage dry well construction method, the structure of the main body section, the closing-up section and the well mouth section is adopted, backfilling is conducted between the well wall and the foundation pit, the dry well of the structure is provided with a large containing cavity and a small opening end, the occupied area is reduced, and the manufacturing cost is low.
本发明涉及水井建造技术领域,尤其是涉及一种蓄水旱井建造方法。该方法包括以下步骤:挖掘基坑:根据设计图纸,挖出井的轮廓;铺砖:从基坑的底部沿基坑的周向逐层垒砖制成井墙,在垒制井墙过程中对井墙和基坑之间的缝隙进行回填;井墙由下到上依次为主体段、收口段和井口段,主体段和井口段均为柱状结构,且井口段的直径小于主体段的直径;涂刷防水层:在井墙和基坑底部设置多层防水层。该方法采用的结构为主体段、收口段和井口段,并对井墙和基坑之间进行回填,此种结构的旱井具有较大的容纳空腔,较小的开口端,减少了占地面积,并且具有较小的制造成本。
Water storage dry well construction method
一种蓄水旱井建造方法
CHEN YONGZHEN (Autor:in)
09.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
Engineering Index Backfile | 1964
|Europäisches Patentamt | 2024
|Well casing centering construction method for underground water monitoring well
Europäisches Patentamt | 2021
|Geology and Water Well Construction
Wiley | 1950
|