Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Circulating fluidized bed boiler structure
The invention discloses a circulating fluidized bed boiler structure. The structure comprises a fuel supply mechanism, a limestone feeding mechanism is fixedly installed on one side of the fuel supply mechanism, a connecting pipe is arranged on the lower end face of the limestone feeding mechanism, a cyclone dust collector is installed on one side of the limestone feeding mechanism, and a hearth is fixedly installed on one side of the cyclone dust collector. An economizer is fixedly installed at one side of the hearth, a heat exchanger is fixedly installed at one end of a connecting pipe, a first finished product bin is fixedly installed at one end of the heat exchanger, a discharging pipe is fixedly installed at the lower end of the cyclone dust collector, a second finished product bin is fixedly installed at one end of the discharging pipe, and a first moving block is slidably connected into the second finished product bin. A sliding rail is installed on the outer side of the first moving block, air inlet pipes are inserted into the two sides of the sliding rail, and a second moving block is fixedly installed on the rear end face of the first moving block. According to the circulating fluidized bed boiler structure, energy is saved, the service life of the device is prolonged, the cooling efficiency of materials is improved, and cooling of the materials is facilitated.
本发明公开了一种循环流化床锅炉结构,包括燃料供应机构,燃料供应机构的一侧固定安装有石灰石给料机构,石灰石给料机构的下端面设有连接管,石灰石给料机构的一侧安装有旋风除尘器,旋风除尘器的一侧固定安装有炉膛,炉膛的一侧固定安装有省煤器,连接管的一端固定安装有换热器,换热器的一端固定安装有甲成品仓,旋风除尘器的下端固定安装有出料管,出料管的一端固定安装有乙成品仓,乙成品仓的内部滑动连接有一号移动块,一号移动块的外侧安装有滑轨,滑轨的两侧均插接有进气管,一号移动块的后端面固定安装有二号移动块。该循环流化床锅炉结构,节约能源,提高了该装置的使用年限,提高了物料的冷却效率,便于物料的冷却。
Circulating fluidized bed boiler structure
The invention discloses a circulating fluidized bed boiler structure. The structure comprises a fuel supply mechanism, a limestone feeding mechanism is fixedly installed on one side of the fuel supply mechanism, a connecting pipe is arranged on the lower end face of the limestone feeding mechanism, a cyclone dust collector is installed on one side of the limestone feeding mechanism, and a hearth is fixedly installed on one side of the cyclone dust collector. An economizer is fixedly installed at one side of the hearth, a heat exchanger is fixedly installed at one end of a connecting pipe, a first finished product bin is fixedly installed at one end of the heat exchanger, a discharging pipe is fixedly installed at the lower end of the cyclone dust collector, a second finished product bin is fixedly installed at one end of the discharging pipe, and a first moving block is slidably connected into the second finished product bin. A sliding rail is installed on the outer side of the first moving block, air inlet pipes are inserted into the two sides of the sliding rail, and a second moving block is fixedly installed on the rear end face of the first moving block. According to the circulating fluidized bed boiler structure, energy is saved, the service life of the device is prolonged, the cooling efficiency of materials is improved, and cooling of the materials is facilitated.
本发明公开了一种循环流化床锅炉结构,包括燃料供应机构,燃料供应机构的一侧固定安装有石灰石给料机构,石灰石给料机构的下端面设有连接管,石灰石给料机构的一侧安装有旋风除尘器,旋风除尘器的一侧固定安装有炉膛,炉膛的一侧固定安装有省煤器,连接管的一端固定安装有换热器,换热器的一端固定安装有甲成品仓,旋风除尘器的下端固定安装有出料管,出料管的一端固定安装有乙成品仓,乙成品仓的内部滑动连接有一号移动块,一号移动块的外侧安装有滑轨,滑轨的两侧均插接有进气管,一号移动块的后端面固定安装有二号移动块。该循环流化床锅炉结构,节约能源,提高了该装置的使用年限,提高了物料的冷却效率,便于物料的冷却。
Circulating fluidized bed boiler structure
一种循环流化床锅炉结构
WU ZHONGMING (Autor:in) / WANG WENDONG (Autor:in) / ZHANG WEI (Autor:in) / ZHAO CHENGLONG (Autor:in)
13.07.2021
Patent
Elektronische Ressource
Chinesisch
Analysis of Mass Balance in a Circulating Fluidized Bed Boiler
British Library Online Contents | 2005
|Compensatory Decoupled Control System of a Circulating Fluidized Bed Boiler
British Library Online Contents | 2000
|Wear of Circulating Fluidized Bed Boiler Elements and Wear-prevention Measures
British Library Online Contents | 2000
|Grout Material for earth tunnel using Circulating fluidized bed boiler ash
Europäisches Patentamt | 2019
|