Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to bridge support building pouring forming equipment and a pouring forming method.The bridge support building pouring forming equipment comprises a mounting bottom frame, a feeding device, feeding ports, a communicating pipe and a material passing device, the feeding device is arranged at the upper end of the mounting bottom frame, the feeding ports are symmetrically formed in the left side and the right side of the upper end face of the mounting bottom frame, and the lower ends of the feeding ports communicate with a communicating pipe; the lower end of the communicating pipe is connected with a material passing device. The problems that according to a traditional Y-shaped bridge support building and pouring forming method, when cement is poured from the upper portion, the cement often blocks the feeding pipeline, manual dredging is needed, and preparation of the bridge support is delayed can be solved, and according to the traditional Y-shaped bridge support building and pouring forming method, due to the fact that the shape of the Y-shaped bridge support is special, and a mold is large, the working strength and the quality of the Y-shaped bridge support are reduced and potential safety hazards are possibly caused due to the fact that the compaction effect is not ideal and the compactness degree of cement in a mold is low when the whole mold is filled with the cement are solved.
本发明涉及一种桥梁支座建造浇筑成型设备及浇筑成型方法,包括安装底架、进料装置、进料口、连通管和通料装置,所述的安装底架的上端设置有进料装置,安装底架上端面的左右两侧对称开设有进料口,进料口的下端连通有连通管,连通管的下端连有通料装置。本发明可以解决传统的Y型桥梁支座建造浇筑成型方法,从上方浇灌水泥时,水泥常常会堵塞在进料管道处,需要人工进行疏通,延误桥梁支座的制备,且传统的Y型桥梁支座建造浇筑成型方法,由于Y型桥梁支座形状较为特殊且模具较大,压实效果不理想,在水泥填满整个模具时,模具内水泥的紧密程度较低,导致Y型桥梁支座的工作强度和质量下降,可能会带来安全隐患等难题。
The invention relates to bridge support building pouring forming equipment and a pouring forming method.The bridge support building pouring forming equipment comprises a mounting bottom frame, a feeding device, feeding ports, a communicating pipe and a material passing device, the feeding device is arranged at the upper end of the mounting bottom frame, the feeding ports are symmetrically formed in the left side and the right side of the upper end face of the mounting bottom frame, and the lower ends of the feeding ports communicate with a communicating pipe; the lower end of the communicating pipe is connected with a material passing device. The problems that according to a traditional Y-shaped bridge support building and pouring forming method, when cement is poured from the upper portion, the cement often blocks the feeding pipeline, manual dredging is needed, and preparation of the bridge support is delayed can be solved, and according to the traditional Y-shaped bridge support building and pouring forming method, due to the fact that the shape of the Y-shaped bridge support is special, and a mold is large, the working strength and the quality of the Y-shaped bridge support are reduced and potential safety hazards are possibly caused due to the fact that the compaction effect is not ideal and the compactness degree of cement in a mold is low when the whole mold is filled with the cement are solved.
本发明涉及一种桥梁支座建造浇筑成型设备及浇筑成型方法,包括安装底架、进料装置、进料口、连通管和通料装置,所述的安装底架的上端设置有进料装置,安装底架上端面的左右两侧对称开设有进料口,进料口的下端连通有连通管,连通管的下端连有通料装置。本发明可以解决传统的Y型桥梁支座建造浇筑成型方法,从上方浇灌水泥时,水泥常常会堵塞在进料管道处,需要人工进行疏通,延误桥梁支座的制备,且传统的Y型桥梁支座建造浇筑成型方法,由于Y型桥梁支座形状较为特殊且模具较大,压实效果不理想,在水泥填满整个模具时,模具内水泥的紧密程度较低,导致Y型桥梁支座的工作强度和质量下降,可能会带来安全隐患等难题。
Bridge support building pouring forming equipment and pouring forming method
一种桥梁支座建造浇筑成型设备及浇筑成型方法
FAN TAO (Autor:in)
13.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Bridge pier pouring forming equipment for road bridge construction and pouring forming method
Europäisches Patentamt | 2021
|House building concrete pouring equipment and pouring method
Europäisches Patentamt | 2024
|British Library Online Contents | 1998
|