Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Lime soil construction process method
The invention relates to the technical field of building construction, and discloses a lime soil construction process method. The lime soil construction process method comprises the following steps that 1, construction preparation is conducted, specifically, suitable construction materials such as lime and water are selected, and mixing proportion design is conducted; 2, lime-soil mixing is conducted; 3, lime soil paving is conducted, specifically, paving operation is conducted through a bulldozer and a land leveler; 4, the lime soil is compacted, specifically, and after the lime soil is paved, a 25-ton road roller is used for rolling in time; 5, a subgrade is subjected to renovation and forming, specifically, a level gauge, a pull wire and a guiding rule are used for checking the elevation and flatness, and the subgrade is subjected to renovation and forming; 6, maintenance is conducted; and 7, quality acceptance is conducted. According to the lime soil construction process method, and the problems of poor lime soil foundation stability and low structural strength caused by an existing lime soil construction process method are effectively solved through preferable construction procedures of construction material preparation, lime soil mixing, lime soil paving, lime soil compacting, subgrade renovation and forming, maintenance and quality acceptance.
本发明涉及建筑施工技术领域,且公开了灰土施工工艺方法,该灰土施工工艺方法包括以下步骤,步骤一,施工准备,选用适宜材料的石灰,水等施工材料并进行混合配合比设计;步骤二,灰土拌和;步骤三,灰土摊铺,采用推土机,平地机进行摊铺作业;步骤四,灰土压实,灰土摊铺好后,采用25吨压路机及时进行碾压;步骤五,路基整修成型,应用水准仪,拉线和靠尺检查标高及平整度,对路基进行修整成型;步骤六,养生;步骤七,质量验收。该灰土施工工艺方法通过采用施工材料准备,灰土拌和,灰土摊铺,灰土压实,路基整修成型,养生,质量验收的优选施工工序,有效解决现有的灰土施工工艺方法造成灰土地基稳定性差,结构强度低问题。
Lime soil construction process method
The invention relates to the technical field of building construction, and discloses a lime soil construction process method. The lime soil construction process method comprises the following steps that 1, construction preparation is conducted, specifically, suitable construction materials such as lime and water are selected, and mixing proportion design is conducted; 2, lime-soil mixing is conducted; 3, lime soil paving is conducted, specifically, paving operation is conducted through a bulldozer and a land leveler; 4, the lime soil is compacted, specifically, and after the lime soil is paved, a 25-ton road roller is used for rolling in time; 5, a subgrade is subjected to renovation and forming, specifically, a level gauge, a pull wire and a guiding rule are used for checking the elevation and flatness, and the subgrade is subjected to renovation and forming; 6, maintenance is conducted; and 7, quality acceptance is conducted. According to the lime soil construction process method, and the problems of poor lime soil foundation stability and low structural strength caused by an existing lime soil construction process method are effectively solved through preferable construction procedures of construction material preparation, lime soil mixing, lime soil paving, lime soil compacting, subgrade renovation and forming, maintenance and quality acceptance.
本发明涉及建筑施工技术领域,且公开了灰土施工工艺方法,该灰土施工工艺方法包括以下步骤,步骤一,施工准备,选用适宜材料的石灰,水等施工材料并进行混合配合比设计;步骤二,灰土拌和;步骤三,灰土摊铺,采用推土机,平地机进行摊铺作业;步骤四,灰土压实,灰土摊铺好后,采用25吨压路机及时进行碾压;步骤五,路基整修成型,应用水准仪,拉线和靠尺检查标高及平整度,对路基进行修整成型;步骤六,养生;步骤七,质量验收。该灰土施工工艺方法通过采用施工材料准备,灰土拌和,灰土摊铺,灰土压实,路基整修成型,养生,质量验收的优选施工工序,有效解决现有的灰土施工工艺方法造成灰土地基稳定性差,结构强度低问题。
Lime soil construction process method
灰土施工工艺方法
HAN ZHUPING (Autor:in) / BAI CHUNQI (Autor:in) / LI CAIYUN (Autor:in) / LIU BOFU (Autor:in)
16.07.2021
Patent
Elektronische Ressource
Chinesisch
Collapsible sand layer lime-soil compaction pile construction process
Europäisches Patentamt | 2024
|Rapid lime paving device for road lime soil base layer construction
Europäisches Patentamt | 2023
|Expansive soil roadbed trapezoidal ditch lime soil cushion construction device
Europäisches Patentamt | 2023
|Lime soil spreading machine for base layer construction
Europäisches Patentamt | 2024
|Soil-Lime Blocks Using Construction Residues - Durability Study
British Library Online Contents | 2012
|