Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Foundation pit waterproof curtain and construction method thereof
The invention relates to the field of constructional engineering, and discloses a foundation pit waterproof curtain and a construction method thereof. The foundation pit waterproof curtain comprises a plurality of water stop columns, wherein the plurality of water stop columns are engaged with one another, reinforcement cages I are pre-buried in the water stop columns, one end of the reinforcement cages I extend to the positions above the top surfaces of the water stop columns, connecting beams are poured among the tops of the plurality of water stop columns, reinforcement cages II are pre-buried in the connecting beams, a plurality of bundles of steel bar groups are inserted into the reinforcement cages II, one end of each steel bar group penetrates through the connecting beams and are located on the side, away from a foundation pit, of the waterproof curtain, and the other end of each steel bar group is located in the foundation pit. The foundation pit waterproof curtain has the effect of reducing deformation of the waterproof curtain caused by side pressure so as to increase the stability of the waterproof curtain.
本申请涉及建筑工程的领域,公开了一种基坑止水帷幕及其施工方法,基坑止水帷幕包括若干根相互咬合的止水柱,所述止水柱内预埋有钢筋笼一,所述钢筋笼一一端延伸至所述止水柱顶面的上方,若干根所述止水柱顶部之间浇筑有连接梁,所述连接梁内预埋有钢筋笼二,所述钢筋笼二中插设有若干捆钢筋组,所述钢筋组的一端穿过所述连接梁位于止水帷幕远离基坑的一侧,所述钢筋组的另一端位于基坑内。本申请具有减少侧压力对止水帷幕造成形变,以提高止水帷幕的稳固性的效果。
Foundation pit waterproof curtain and construction method thereof
The invention relates to the field of constructional engineering, and discloses a foundation pit waterproof curtain and a construction method thereof. The foundation pit waterproof curtain comprises a plurality of water stop columns, wherein the plurality of water stop columns are engaged with one another, reinforcement cages I are pre-buried in the water stop columns, one end of the reinforcement cages I extend to the positions above the top surfaces of the water stop columns, connecting beams are poured among the tops of the plurality of water stop columns, reinforcement cages II are pre-buried in the connecting beams, a plurality of bundles of steel bar groups are inserted into the reinforcement cages II, one end of each steel bar group penetrates through the connecting beams and are located on the side, away from a foundation pit, of the waterproof curtain, and the other end of each steel bar group is located in the foundation pit. The foundation pit waterproof curtain has the effect of reducing deformation of the waterproof curtain caused by side pressure so as to increase the stability of the waterproof curtain.
本申请涉及建筑工程的领域,公开了一种基坑止水帷幕及其施工方法,基坑止水帷幕包括若干根相互咬合的止水柱,所述止水柱内预埋有钢筋笼一,所述钢筋笼一一端延伸至所述止水柱顶面的上方,若干根所述止水柱顶部之间浇筑有连接梁,所述连接梁内预埋有钢筋笼二,所述钢筋笼二中插设有若干捆钢筋组,所述钢筋组的一端穿过所述连接梁位于止水帷幕远离基坑的一侧,所述钢筋组的另一端位于基坑内。本申请具有减少侧压力对止水帷幕造成形变,以提高止水帷幕的稳固性的效果。
Foundation pit waterproof curtain and construction method thereof
一种基坑止水帷幕及其施工方法
YAN QUANDE (Autor:in)
20.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foundation pit waterproof curtain and construction method thereof
Europäisches Patentamt | 2020
|Foundation pit waterproof curtain and construction method thereof
Europäisches Patentamt | 2024
|Foundation pit waterproof curtain and construction method thereof
Europäisches Patentamt | 2023
|Foundation pit waterproof curtain and construction method thereof
Europäisches Patentamt | 2024
|Foundation pit waterproof curtain and construction method thereof
Europäisches Patentamt | 2022
|