Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction process of structure containing FS101 multi-layer waterproof mortar
The invention discloses a construction process of a structure containing FS101 multi-layer waterproof mortar. The construction process comprises the following steps that a concrete bottom plate is laid, and a FS102 dense waterproof agent is doped into concrete slurry; a waterproof mortar layer containing a FS101 mortar waterproof agent is arranged on the upper side of the concrete bottom plate; the top face of the waterproof mortar layer is coated with a layer of neat cement paste containing the FS101 mortar waterproof agent; and a concrete cushion layer is arranged on the upper side of the neat cement paste, and a layer of foundation soil is arranged on the upper portion of the concrete cushion layer. The construction process of the structure containing the FS101 multi-layer waterproof mortar is used for structural waterproofing of a upstream face, is reasonable in structure, convenient to construct and capable of effectively preventing water from permeating and has the advantage of being good in sealing performance.
本发明公开了一种含有FS101多层防水砂浆构造的施工工艺,其包括:铺设混凝土底板,在混凝土浆料中掺入FS102密实型防水剂;在所述混凝土底板的上侧设置含有FS101砂浆防水剂的防水砂浆层;在所述防水砂浆层的顶面涂刷一层含有FS101砂浆防水剂的水泥素浆;在所述水泥素浆的上侧设置混凝土垫层,在所述混凝土垫层的上部设置一层地基土。本发明提供的一种含有FS101多层防水砂浆构造的施工工艺,用于迎水面的结构防水,其结构合理,施工便捷,能够有效防止水分渗入,具有密封性良好的优点。
Construction process of structure containing FS101 multi-layer waterproof mortar
The invention discloses a construction process of a structure containing FS101 multi-layer waterproof mortar. The construction process comprises the following steps that a concrete bottom plate is laid, and a FS102 dense waterproof agent is doped into concrete slurry; a waterproof mortar layer containing a FS101 mortar waterproof agent is arranged on the upper side of the concrete bottom plate; the top face of the waterproof mortar layer is coated with a layer of neat cement paste containing the FS101 mortar waterproof agent; and a concrete cushion layer is arranged on the upper side of the neat cement paste, and a layer of foundation soil is arranged on the upper portion of the concrete cushion layer. The construction process of the structure containing the FS101 multi-layer waterproof mortar is used for structural waterproofing of a upstream face, is reasonable in structure, convenient to construct and capable of effectively preventing water from permeating and has the advantage of being good in sealing performance.
本发明公开了一种含有FS101多层防水砂浆构造的施工工艺,其包括:铺设混凝土底板,在混凝土浆料中掺入FS102密实型防水剂;在所述混凝土底板的上侧设置含有FS101砂浆防水剂的防水砂浆层;在所述防水砂浆层的顶面涂刷一层含有FS101砂浆防水剂的水泥素浆;在所述水泥素浆的上侧设置混凝土垫层,在所述混凝土垫层的上部设置一层地基土。本发明提供的一种含有FS101多层防水砂浆构造的施工工艺,用于迎水面的结构防水,其结构合理,施工便捷,能够有效防止水分渗入,具有密封性良好的优点。
Construction process of structure containing FS101 multi-layer waterproof mortar
一种含有FS101多层防水砂浆构造的施工工艺
WANG CHENYUE (Autor:in)
23.07.2021
Patent
Elektronische Ressource
Chinesisch
Construction method of multi-layer waterproof mortar construction joint
Europäisches Patentamt | 2021
|Construction process of downstream face structure containing FS101 waterproof mortar
Europäisches Patentamt | 2021
|Special multi-layer waterproof mortar spraying machine and construction method
Europäisches Patentamt | 2021
|Phosphorus slag waterproof plastering mortar and mortar plastering waterproof construction method
Europäisches Patentamt | 2021
|