Formwork erecting construction method for tube well post-pouring plates
The invention discloses a formwork erecting construction method for tube well post-pouring plates, and relates to the field of elevator shaft post-pouring plate construction. Round holes are reserved in a tube well concrete wall, steel tubes are inserted into the round holes, a formwork device is buckled on the steel tubes to form a post-pouring plate working face, a high-rise working face does not need to be erected, aerial work is not involved, potential safety hazards are avoided, materials are saved, and the construction cost is reduced; and multiple layers of post-pouring plates are constructed simultaneously, so that the construction period is shortened.
本发明公开了一种用于管井后浇板的支模施工方法,涉及电梯井后浇板施工领域。本发明通过在管井混凝土墙上预留圆孔,在圆孔中插装钢管,将模板装置扣在钢管上形成后浇板工作面,无需架设高层工作面,不涉及高空作业,无安全隐患,节省材料,降低施工成本;多层后浇板同时施工,缩短施工周期。
Formwork erecting construction method for tube well post-pouring plates
The invention discloses a formwork erecting construction method for tube well post-pouring plates, and relates to the field of elevator shaft post-pouring plate construction. Round holes are reserved in a tube well concrete wall, steel tubes are inserted into the round holes, a formwork device is buckled on the steel tubes to form a post-pouring plate working face, a high-rise working face does not need to be erected, aerial work is not involved, potential safety hazards are avoided, materials are saved, and the construction cost is reduced; and multiple layers of post-pouring plates are constructed simultaneously, so that the construction period is shortened.
本发明公开了一种用于管井后浇板的支模施工方法,涉及电梯井后浇板施工领域。本发明通过在管井混凝土墙上预留圆孔,在圆孔中插装钢管,将模板装置扣在钢管上形成后浇板工作面,无需架设高层工作面,不涉及高空作业,无安全隐患,节省材料,降低施工成本;多层后浇板同时施工,缩短施工周期。
Formwork erecting construction method for tube well post-pouring plates
用于管井后浇板的支模施工方法
HAN CHUN (Autor:in) / ZHONG YINGZHUO (Autor:in) / XU LINGLONG (Autor:in)
23.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2021
|Auxiliary device and construction method for erecting concrete pouring formwork
Europäisches Patentamt | 2021
|Formwork erecting and pouring construction method for light movable formwork of lock chamber wall
Europäisches Patentamt | 2023
|V-shaped groove sliding formwork system and formwork erecting and pouring method
Europäisches Patentamt | 2022
|