Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated composite floor slab
The invention discloses a fabricated composite floor slab. The fabricated composite floor slab comprises a first composite floor slab body, first channel steel, extrusion positioning devices, second channel steel and mounting blocks, wherein a mounting groove is formed in the left side of the top end of the first composite floor slab body, mud grooves are formed in the mounting groove, a threaded rod is fixed in the mounting groove, matching grooves are formed in the top end and the bottom of the mounting groove correspondingly, first connecting steel is fixedly embedded in the bottom of the first composite floor slab body, first connecting holes are formed in the two sides of the first steel channel, and the left side of the first steel channel is fixedly connected with the right side of the first composite floor slab in an embedded mode. According to the fabricated composite floor slab, the extrusion positioning devices are arranged, cams are extruded through mounting blocks, so that compression springs are extruded through the cams, the cams and the grooves are connected in a clamped and matched mode, and therefore the situation that the mounting position and distance of the whole composite floor slab need to be continuously adjusted in the mounting process of the whole composite floor slab, the mounting time of the whole composite floor slab is sequentially increased, and the mounting efficiency is reduced is avoided.
本发明公开了一种装配式叠合楼板,包括第一叠合楼板、第一槽钢、挤压定位装置、第二槽钢和安装块,所述第一叠合楼板顶端左侧开设有安装槽,所述安装槽内部开设有泥槽,且安装槽内部固定有螺纹杆,所述安装槽顶端和底部均开设有配套槽,所述第一叠合楼板底部镶嵌固定有第一连接钢,所述第一槽钢两侧开设有第一连接孔,且第一槽钢左侧与第一叠合楼板右侧镶嵌固定连接,该装配式叠合楼板设置有挤压定位装置,通过安装块挤压凸轮从而通过凸轮挤压压缩弹簧,使凸轮与凹槽之间进行卡合配套连接处理,从而避免整体叠合楼板安装过程中需要不断调整整体叠合楼板安装位置和距离,依次增加整体叠合楼板安装时间和降低安装效率。
Fabricated composite floor slab
The invention discloses a fabricated composite floor slab. The fabricated composite floor slab comprises a first composite floor slab body, first channel steel, extrusion positioning devices, second channel steel and mounting blocks, wherein a mounting groove is formed in the left side of the top end of the first composite floor slab body, mud grooves are formed in the mounting groove, a threaded rod is fixed in the mounting groove, matching grooves are formed in the top end and the bottom of the mounting groove correspondingly, first connecting steel is fixedly embedded in the bottom of the first composite floor slab body, first connecting holes are formed in the two sides of the first steel channel, and the left side of the first steel channel is fixedly connected with the right side of the first composite floor slab in an embedded mode. According to the fabricated composite floor slab, the extrusion positioning devices are arranged, cams are extruded through mounting blocks, so that compression springs are extruded through the cams, the cams and the grooves are connected in a clamped and matched mode, and therefore the situation that the mounting position and distance of the whole composite floor slab need to be continuously adjusted in the mounting process of the whole composite floor slab, the mounting time of the whole composite floor slab is sequentially increased, and the mounting efficiency is reduced is avoided.
本发明公开了一种装配式叠合楼板,包括第一叠合楼板、第一槽钢、挤压定位装置、第二槽钢和安装块,所述第一叠合楼板顶端左侧开设有安装槽,所述安装槽内部开设有泥槽,且安装槽内部固定有螺纹杆,所述安装槽顶端和底部均开设有配套槽,所述第一叠合楼板底部镶嵌固定有第一连接钢,所述第一槽钢两侧开设有第一连接孔,且第一槽钢左侧与第一叠合楼板右侧镶嵌固定连接,该装配式叠合楼板设置有挤压定位装置,通过安装块挤压凸轮从而通过凸轮挤压压缩弹簧,使凸轮与凹槽之间进行卡合配套连接处理,从而避免整体叠合楼板安装过程中需要不断调整整体叠合楼板安装位置和距离,依次增加整体叠合楼板安装时间和降低安装效率。
Fabricated composite floor slab
一种装配式叠合楼板
DONG CHEN (Autor:in) / ZHU XINYING (Autor:in) / WU FENG (Autor:in) / XU CHEN (Autor:in)
27.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS