Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of prefabricated assembly type pipe gallery
The invention provides a construction method of a prefabricated assembly type pipe gallery, and relates to the technical field of pipe tunnel construction. The construction is carried out based on a plate transporting vehicle, a prefabricated part splicing machine of a sub-bin supporting system and an integrated mounting vehicle of prefabricated partition plates. The method comprises the steps that 1, prefabricated parts are spliced into the sub-bin supporting system on shield segments on the lower portion of a tunnel through the plate transporting vehicle and the prefabricated part splicing machine; and 2, the prefabricated partition plates are laid on prefabricated longitudinal beams of the sub-bin supporting system through the integrated mounting vehicle to form a sub-bin structure. According to the construction method, a large number of workers do not need to erect formworks on a construction site, various construction equipment do not need to be stocked on the site, the construction environment is neater, ordered management can be achieved, construction is safer, meanwhile, factory-like, standardized and assembled construction can be achieved, and the construction efficiency of the pipe gallery is improved.
本发明提供了一种预制装配式管廊的施工方法,涉及管隧施工技术领域,基于运板车、分仓支撑体系的预制构件拼装机以及预制隔板的一体式安装车进行施工,包括:步骤1:通过运板车和预制构件拼装机在隧道下部的盾构管片上将预制构件拼装成分仓支撑体系;步骤2:通过一体式安装车在分仓支撑体系的预制纵梁上铺设预制隔板形成分仓结构。本发明中不需要大量工人在施工现场架设模板,也不需要在现场囤积各种施工设备,施工环境更加整洁,可以实现有序管理,使得施工更加安全,同时,能够实现工厂化、标准化和装配化施工,提高了管廊的施工效率。
Construction method of prefabricated assembly type pipe gallery
The invention provides a construction method of a prefabricated assembly type pipe gallery, and relates to the technical field of pipe tunnel construction. The construction is carried out based on a plate transporting vehicle, a prefabricated part splicing machine of a sub-bin supporting system and an integrated mounting vehicle of prefabricated partition plates. The method comprises the steps that 1, prefabricated parts are spliced into the sub-bin supporting system on shield segments on the lower portion of a tunnel through the plate transporting vehicle and the prefabricated part splicing machine; and 2, the prefabricated partition plates are laid on prefabricated longitudinal beams of the sub-bin supporting system through the integrated mounting vehicle to form a sub-bin structure. According to the construction method, a large number of workers do not need to erect formworks on a construction site, various construction equipment do not need to be stocked on the site, the construction environment is neater, ordered management can be achieved, construction is safer, meanwhile, factory-like, standardized and assembled construction can be achieved, and the construction efficiency of the pipe gallery is improved.
本发明提供了一种预制装配式管廊的施工方法,涉及管隧施工技术领域,基于运板车、分仓支撑体系的预制构件拼装机以及预制隔板的一体式安装车进行施工,包括:步骤1:通过运板车和预制构件拼装机在隧道下部的盾构管片上将预制构件拼装成分仓支撑体系;步骤2:通过一体式安装车在分仓支撑体系的预制纵梁上铺设预制隔板形成分仓结构。本发明中不需要大量工人在施工现场架设模板,也不需要在现场囤积各种施工设备,施工环境更加整洁,可以实现有序管理,使得施工更加安全,同时,能够实现工厂化、标准化和装配化施工,提高了管廊的施工效率。
Construction method of prefabricated assembly type pipe gallery
一种预制装配式管廊的施工方法
LUO PU (Autor:in) / SHU JUN (Autor:in) / MA WENBIN (Autor:in) / CHENG FENG (Autor:in) / SHI DONGXING (Autor:in) / YU FENCHAO (Autor:in) / WANG XIAOPENG (Autor:in) / NIU ZHUANGZHUANG (Autor:in) / MA ZHAOHUI (Autor:in) / DING YUGE (Autor:in)
30.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated assembly type pipe gallery and construction method thereof
Europäisches Patentamt | 2021
|Assembly type prefabricated comprehensive pipe gallery
Europäisches Patentamt | 2024
|Assembly construction method of prefabricated comprehensive pipe gallery
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Assembly type prefabricated urban comprehensive pipe gallery
Europäisches Patentamt | 2023
|