Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to an integrated scaffold anti-falling structure. The anti-falling structure comprises an L-shaped mounting plate, an anti-falling framework device, a fixed butt joint device and a protective net device; the anti-falling framework device and the protective net device are arranged on the two end faces of the L-shaped mounting plate; and the protective net device is arranged in the L-shaped mounting plate. According to the invention, anti-falling structures of all layers are quickly disassembled, assembled, laid and reinforced, and then are fixedly connected, so that the integral anti-falling structure is manufactured, and the problem that the preparation time of construction in a construction site is prolonged as a layer of protective net surrounds the outer circle of a scaffold, a reinforcing frame is arranged on the periphery of a protective net, and the anti-falling structure is very complex and trivial to install is solved; and the problem that the anti-falling structures of the upper layer and the lower layer are difficult to align before butt joint is solved in a mode that the anti-falling structures are clamped and aligned firstly and then are fixedly connected.
本发明涉及一种集成式脚手架防坠结构,包括L型安装板、防坠骨架装置、固定对接装置和护网装置,L型安装板两端面上设置有防坠骨架装置和护网装置,L型安装板内设置有护网装置;本发明通过每层的防坠结构快速拆装铺设后加固,再将每层的防坠结构相固定连接,从而制成整体的防坠结构,解决了在脚手架外圈围一层防护网,防护网外围再设置有加固架,这种防坠结构安装起来十分复杂且琐碎,从而增长了工地施工的准备时间的问题;本发明通过先卡接对位后再进行固定连接的方式,解决了上下每层防坠结构之间对接前难以对位的问题。
The invention relates to an integrated scaffold anti-falling structure. The anti-falling structure comprises an L-shaped mounting plate, an anti-falling framework device, a fixed butt joint device and a protective net device; the anti-falling framework device and the protective net device are arranged on the two end faces of the L-shaped mounting plate; and the protective net device is arranged in the L-shaped mounting plate. According to the invention, anti-falling structures of all layers are quickly disassembled, assembled, laid and reinforced, and then are fixedly connected, so that the integral anti-falling structure is manufactured, and the problem that the preparation time of construction in a construction site is prolonged as a layer of protective net surrounds the outer circle of a scaffold, a reinforcing frame is arranged on the periphery of a protective net, and the anti-falling structure is very complex and trivial to install is solved; and the problem that the anti-falling structures of the upper layer and the lower layer are difficult to align before butt joint is solved in a mode that the anti-falling structures are clamped and aligned firstly and then are fixedly connected.
本发明涉及一种集成式脚手架防坠结构,包括L型安装板、防坠骨架装置、固定对接装置和护网装置,L型安装板两端面上设置有防坠骨架装置和护网装置,L型安装板内设置有护网装置;本发明通过每层的防坠结构快速拆装铺设后加固,再将每层的防坠结构相固定连接,从而制成整体的防坠结构,解决了在脚手架外圈围一层防护网,防护网外围再设置有加固架,这种防坠结构安装起来十分复杂且琐碎,从而增长了工地施工的准备时间的问题;本发明通过先卡接对位后再进行固定连接的方式,解决了上下每层防坠结构之间对接前难以对位的问题。