Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PREFABRICATED MODULE INTERCONNECTION FOR MODULAR BUILDING
An attachment between adjacent concrete-based prefabricated modules in a single storey of a multi-storey modular building is provided. A first concrete-based prefabricated module includes at least two vertical walls and at least a ceiling or a floor. A plurality of first reinforcing attachment members is connected to a first vertical wall including periodic projections extending from the first vertical wall. The second module similarly includes at least two vertical walls, ceiling or floor, and attachment members. The first prefabricated module and the second prefabricated module are positioned adjacent to one another such that the first attachment member periodic projections face the second attachment member periodic projections. A tie assembly engages the first and second attachment member periodic projections. In-situ cast concrete embeds the first and second attachment members and fills a space between the first module first vertical wall and the second module second vertical wall to complete structural connection.
本公开文件提供一种連接件,使用于同多层模块化建筑物中,同楼层的相鄰混凝土预制模块之間。第一混凝土预制模块包括至少两个垂直墙体和至少一天花板或地板。多个第一增强连接构件连接到第一垂直墙体,该第一增强连接构件周期性突出于第一垂直墙体外。第二混凝土预制模块類似地包括至少两个垂直墙体、一天花板或地板、和连接构件。第一预制模块和第二预制模块被对位成与彼此相邻,使得所述周期性突出的第一连接构件与所述突出的第二连接构件接近。在此还提供一种接合突出的第一和第二连接构件的系紧组件。第一和第二连接构件部分嵌入至混凝土预制模块中,现浇混凝土填充在第一模块的第一垂直墙体和第二模块的第二墙体之间的空间,以完成结构连接。
PREFABRICATED MODULE INTERCONNECTION FOR MODULAR BUILDING
An attachment between adjacent concrete-based prefabricated modules in a single storey of a multi-storey modular building is provided. A first concrete-based prefabricated module includes at least two vertical walls and at least a ceiling or a floor. A plurality of first reinforcing attachment members is connected to a first vertical wall including periodic projections extending from the first vertical wall. The second module similarly includes at least two vertical walls, ceiling or floor, and attachment members. The first prefabricated module and the second prefabricated module are positioned adjacent to one another such that the first attachment member periodic projections face the second attachment member periodic projections. A tie assembly engages the first and second attachment member periodic projections. In-situ cast concrete embeds the first and second attachment members and fills a space between the first module first vertical wall and the second module second vertical wall to complete structural connection.
本公开文件提供一种連接件,使用于同多层模块化建筑物中,同楼层的相鄰混凝土预制模块之間。第一混凝土预制模块包括至少两个垂直墙体和至少一天花板或地板。多个第一增强连接构件连接到第一垂直墙体,该第一增强连接构件周期性突出于第一垂直墙体外。第二混凝土预制模块類似地包括至少两个垂直墙体、一天花板或地板、和连接构件。第一预制模块和第二预制模块被对位成与彼此相邻,使得所述周期性突出的第一连接构件与所述突出的第二连接构件接近。在此还提供一种接合突出的第一和第二连接构件的系紧组件。第一和第二连接构件部分嵌入至混凝土预制模块中,现浇混凝土填充在第一模块的第一垂直墙体和第二模块的第二墙体之间的空间,以完成结构连接。
PREFABRICATED MODULE INTERCONNECTION FOR MODULAR BUILDING
用於模块化建筑物的预制模块的互连方法
LIANG HUIWEN (Autor:in) / ZHOU SHUJIA (Autor:in)
30.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
PREFABRICATED MODULE INTERCONNECTION FOR MODULAR BUILDING
Europäisches Patentamt | 2020
|Prefabricated module interconnection device of modular building
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2025
|Europäisches Patentamt | 2024
|