Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building main body construction method and floor slab pouring auxiliary device
The invention relates to a building main body construction method and a floor slab pouring auxiliary device. The building main body construction method mainly comprises the following steps that S1, a building main body is divided into a plurality of construction sections which are sequentially arranged from top to bottom, each construction section comprises a plurality of floors, and hoisting of vertical components of all floors of the first construction section at the bottommost position is completed firstly; S2, hoisting of steel structure beams of all floors of the first construction section is completed; S3, formwork materials of floor slabs of all floors in the first construction section and formwork materials of floor slabs of the bottommost floor of the second construction section are hoisted to the corresponding floors; S4, each vertical concrete component of the first construction section is poured; S5, a floor slab of the bottommost floor of the second construction section is subjected to pouring forming; and S6, floor slabs of all floors in the first construction section are poured layer by layer from bottom to top, and meanwhile, when the first construction section is conducted, the second construction section repeats the construction steps from S1 to S5 at the same time. The method has the effect of shortening the building construction period.
本申请涉及一种建筑主体施工方法以及楼板浇筑辅助装置,主要包括以下步骤:S1、将建筑主体分割成自上而下依次设置的若干施工节,各施工节中均包含若干层楼层,先完成最底下的第一施工节的各楼层竖向构件的吊装;S2、完成第一施工节各楼层钢构粱的吊装;S3、将第一施工节中各楼层楼板以及第二施工节最底层楼层楼板的模板材料吊装至对应的楼层上;S4、对第一施工节的各竖向混凝土构件进行浇筑;S5、将对第二施工节最底层楼层楼板进行浇筑成型;S6、将对第一施工节中各楼层的楼板自下而上逐层进行浇筑,与此同时,在进行第一施工节时,第二施工节将同时重复以上S1‑S5的施工步骤。本申请具有缩短建筑施工周期的效果。
Building main body construction method and floor slab pouring auxiliary device
The invention relates to a building main body construction method and a floor slab pouring auxiliary device. The building main body construction method mainly comprises the following steps that S1, a building main body is divided into a plurality of construction sections which are sequentially arranged from top to bottom, each construction section comprises a plurality of floors, and hoisting of vertical components of all floors of the first construction section at the bottommost position is completed firstly; S2, hoisting of steel structure beams of all floors of the first construction section is completed; S3, formwork materials of floor slabs of all floors in the first construction section and formwork materials of floor slabs of the bottommost floor of the second construction section are hoisted to the corresponding floors; S4, each vertical concrete component of the first construction section is poured; S5, a floor slab of the bottommost floor of the second construction section is subjected to pouring forming; and S6, floor slabs of all floors in the first construction section are poured layer by layer from bottom to top, and meanwhile, when the first construction section is conducted, the second construction section repeats the construction steps from S1 to S5 at the same time. The method has the effect of shortening the building construction period.
本申请涉及一种建筑主体施工方法以及楼板浇筑辅助装置,主要包括以下步骤:S1、将建筑主体分割成自上而下依次设置的若干施工节,各施工节中均包含若干层楼层,先完成最底下的第一施工节的各楼层竖向构件的吊装;S2、完成第一施工节各楼层钢构粱的吊装;S3、将第一施工节中各楼层楼板以及第二施工节最底层楼层楼板的模板材料吊装至对应的楼层上;S4、对第一施工节的各竖向混凝土构件进行浇筑;S5、将对第二施工节最底层楼层楼板进行浇筑成型;S6、将对第一施工节中各楼层的楼板自下而上逐层进行浇筑,与此同时,在进行第一施工节时,第二施工节将同时重复以上S1‑S5的施工步骤。本申请具有缩短建筑施工周期的效果。
Building main body construction method and floor slab pouring auxiliary device
一种建筑主体施工方法以及楼板浇筑辅助装置
ZHENG MEIXIANG (Autor:in) / CHEN JINYONG (Autor:in) / LIN JIANLI (Autor:in)
06.08.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Floor slab supporting device and floor slab pouring method
Europäisches Patentamt | 2023
|Device for pouring floor slab and floor slab formed by pouring same
Europäisches Patentamt | 2024
|Post-pouring construction method for floor slab at building tube well
Europäisches Patentamt | 2022
|House building floor slab concrete pouring operation rack
Europäisches Patentamt | 2020
|